   Material Master Change Mgmt and Planning Material Master Changes 
物料主数据更改管理和计划更改
Purpose 目的
You can change the material master using one of three different methods. The easiest method is to change the required fields in the material master and activate these changes immediately. Changes can also be planned in advance. You do this either by entering a planned change for a single material master (with the date on which the changes are activated) or using the Engineering Change Management function. In this case, changes to several objects (materials, BOMs, task lists, and so on) can be grouped together in a change master record and activated on a defined date.
你可以使用三种不同的方法来更改物料主数据。最简便的方法是只需更改需要的栏位并立即激活它们。更改活动也可以预期计划。你可以输入一个更改计划用于单个物料主记录(包括更改生效的日期),或也可以使用工程更改管理功能。在这种情况下,@? 几个对象(物料、物料清单、计划清单等等)的更改汇集到一个变更主记录中,并在同一个事先定义的日期内生效。
Field 栏位
Europe 欧洲
North America 北美洲
Description 描述
Plant 工厂
1000
3000
Plant number 工厂代码
Material 物料
1300-520
1300-520
Material number 物料编号
Change master record 更改主记录
MMCM-PUR
MMCM-PUR
Change master record number 主数据更改编号
 Process Flow 操作步骤
  1. Changing the Material Master Immediately立即更改物料主数据
  2. Planning Changes to the Material Master计划更改物料主数据
  3. Displaying the Change Master Record显示更改主记录
  4. Displaying Planned Changes显示计划更改
  5. Activating Planned Changes激活计划更改
 Changing the Material Master 
更改物料主数据
Procedure 步骤
  1. Call up the transaction as follows:
    调用事务时请使用:
Menu Path 菜单路径
Logistics ® Materials Management ® Material Master ® Material ® Change ® Immediately
后勤®物料管理®物料主数据®物料®更改®立即
Transaction Code 事务代码
MM02
  1. On the Change Material: Initial Screen, enter the following data:
    在更改物料:初始屏幕,输入如下条目:
Field 栏位
Europe