用户操作
[即时聊天] [发私信] [加为好友]
zhou JamesID:jameszhou
91958次访问,排名1010好友3人,关注者36
PMP & MCAD
jameszhou的文章
原创 92 篇
翻译 0 篇
转载 0 篇
评论 72 篇
James Zhou的公告
Locations of visitors to this page

最近评论
Microsoft_China_Vip:



www.soAsp.net 编程学习网 技术+ 实例应用 讲解不错。 推荐大家!

有很多 技术资料也很好!


chjttony:说多了,没什么意思啊,时间才能证明一切,等到看就有答案了
kenpusney:总感觉微软没前途...
控制帐户:很好。
找了半天什么是控制帐户,终于看到这里有说明。
不过英文看起来恼火。
aladdin:這沒有帶來什麼思想解放阿...

1. HttpContext.RewriteUrl,從2003年就開始用了。

2. M$沒事把這些並不是常常需要用到的把戲,弄得好像和藹可親,但卻常常忘記了: 1) Layering,2) Lightweight,再加上M$常常給出不正確的practice,以致於新的小朋友進公司,還得要花上很多時間把這些錯誤從他們的……
文章分类
收藏
    相册
    链接
    Old Blog - Runner on .NET
    存档
    订阅我的博客
    XML聚合  FeedSky

    原创 [概念] 质量管理标准和理论 - ISO/Deming/Juran/TQM收藏

    新一篇: MS CRM Callouts Tip - Debug and Development | 旧一篇: [概念] Prioritization Matrix

    PMBOK (2004 3rd 英) P180提到了诸多质量管理理论,但是没有解释各个理论。补充如下

    http://www.brecker.com/quality.htm

    ISO/QS9000


    ISO9000 was developed as a standard for business quality systems. To be certified, businesses needed to document their quality system and insure adherence to it with reviews and audits. A key element was the identification of non-conformances and a Corrective Action System to prevent reoccurences. Specific quality improvement methodologies were not prescribed.

    The automotive industry adopted the QS9000 standard for their suppliers to require the use of specific practices in quality planning and in production operations.

    • Advanced Product Quality Plans
    • Design / Process Failure Mode and Effects Analysis (FMEA)
    • Production Part Approval Process
    • Control Plans (for production)
    • Measurement Systems Analysis

      Deming PDCA

    The Deming / Shewhart Cycle was especially useful in solving these quality problems. The PDCA Circle denotes continuous improvement by repeating the basic cycle of

        * Deming PDCA Plan
              o Get the data
              o Analyze the problem
              o Plan the solution
        * "Do" It
        * Check -- Measure the change
        * Act -- Modify as needed

    as long as significant improvements are obtained.



    Carnegie Plan Since 1948, engineers at Carnegie Tech (now Carnegie Mellon University) have been trained to apply the Carnegie problem solving methodology in design. This methodology parallels the Deming PDCA cycle with the addition of an initial step to "Define the Problem."


    In the last 20 years, many companies have adopted similar problem-solving models -- often with 8-10 steps or more. Special attention is given to solving process problems -- problems that occur repetitively. Process improvement models add such steps as assigning process owners, forming teams, and establishing process measures.

    Juran

    Juran focused on quality control with the "trilogy"

        * quality planning
        * quality control
        * quality improvement.

    Juran An SPC representation of the trilogy is used in the figure at the right. A spec is developed -- usually with a ± tolerance. A control chart is used to get the process under control. As special causes are removed to improve the process , variation is reduced. These are the basic steps in Six Sigma process improvement.

    When the total quality management movement (TQM) gained prominence in the 1980's, the product planning step was expanded to include a broader evaluation of customer needs (similar to VA and QFD ).



      TQM



    Total Quality Management (TQM) emphasized using multi-functional teams (professional staff and workers from all departments involved) to solve problems. The teams were trained to use basic statistical tools to collect and analyze data.

                * Check sheets
                * Pareto diagrams
                * Histograms
                * Run charts
                * Flow charts
                * Cause and effect diagrams
                * Force field analysis
                * Scatter diagrams

    发表于 @ 2007年06月26日 00:25:00|评论(loading...)|编辑

    新一篇: MS CRM Callouts Tip - Debug and Development | 旧一篇: [概念] Prioritization Matrix

    评论:没有评论。

    发表评论  


    当前用户设置只有注册用户才能发表评论。如果你没有登录,请点击登录
    Csdn Blog version 3.1a
    Copyright © James Zhou