Design to Schedule Model

原创 2013年12月03日 18:08:22

Design to Schedule Model

Design to Schedule Model is said to be the most efficient model in terms of timing and scheduling. It is believed that this model utilizes the same process as that of the Staged Delivery model in a sense that there is a “deliverable” at every stage; however, it does not hold the same predictability as the former and at times, a product’s full potential may not be developed. All the same, the Design to Schedule model can ensure that the product is going to be ready at any time necessary.

Design to Schedule Phases

As mentioned earlier, the Design to Schedule model follows a similar process with Staged Delivery, which means that the phases are more or less the same- except for some minor exemptions.

Concept Creation and Requirement Gathering: The first phase in which the project team will decide on what the project is going to be all about, as well as securing the initial requirements needed for it.

Planning and Designing: The plotting of goals is set during this phase. Additionally, setting of priorities is going to take place here and it is always important to make sure that priorities are carefully considered. A failure when using this model usually occurs when priorities are not well planned.

Implementation: The phase where each objective or priority is being attended to, including implementation and testing of the outputs. Those placed under high priority goes first and the one that is lowest in priority of course goes last.

Evaluation: When everything is done, documentation and data are assessed to make a checklist on what works and what does not for a particular product or service. This way, a more objective and reliable assessment is made.

Advantages of Design to Schedule Model

The Design to Schedule model provides lesser instances for errors to be committed during the course of the project. With constant testing done in the 3rd stage, minimal or no error can be expected. Furthermore, you can easily take the product out at any given time and it will still be ready to function. As testing is done throughout, you can be assured that if for some reason you need to take it out, the product can be delivered by then. Fixed dates for release can be had with the Design to Schedule model.

Disadvantages of Design to Schedule Model

This particular model indicates that a project team’s ability to provide “deliverables” at any stage is more important than the cost it will incur, and whether or not the needs or goals have been met. This makes it more ideal for well-structured systems because if some factors are not solid, chances are, this model will not work for this particular project. Moreover, it would require skilled management to be part of the project team, who can correctly conduct planning and implementation perfectly, as corrections are almost not tolerated in this type of model.

It is also noteworthy to mention that time is often not utilized well when using the Design to Schedule model. With so much time set aside for planning, many of the ideas and proposals may not even be included during the last few stages because of resource constraint.

The Design to Schedule model is suitable for projects that are made out of proven systems and structures. It works best for those that can provide heavy supervision because if errors are committed within the course of the project, it may greatly affect its entirety. But because there is constant implementation and testing on every specific objective- which is set depending on how the project team has deemed it to be important, there is less likelihood for systems and processes to be jeopardized. For this reason, a lot of companies employ this model when they are handling some important projects.

Systems Engineering with SysML/UML: Modeling, Analysis, Design

版权声明:原创作品,允许转载,转载时请务必以超链接形式标明文章原始出版、作者信息和本声明。否则将追究法律责任。http://blog.csdn.net/topmvp - topmvpUML, the ...
  • topmvp
  • topmvp
  • 2008年12月21日 17:23
  • 534

Study Flex《Out of memory-cannot load design mode》

一、描述 前段时间安装了Flash cs6,然后用Flash Builder 4时就后出现cannot load design。如下: 二、解决方法 \Program Files (x86)...
  • jiangdragon
  • jiangdragon
  • 2013年05月23日 09:07
  • 1789

Designing ActiveX Components with the MFC Document/View Model

W hether youre an experienced Win32® guru or a junior Windows® wanna-be, you...
  • l12345678
  • l12345678
  • 2007年07月27日 14:56
  • 7117

Design Pattern----Behavioral Patterns

Behavioral Patterns可以分为两类设计模式:Behavioral Class Patterns(行为类模式)和Behavioral Object Patterns(行为对象模式)。 B...
  • ccsu_001
  • ccsu_001
  • 2014年09月10日 16:55
  • 1866

Design Model

提到设计模式,不得不感谢GoF(Gang of Four,四人组),他们1995年出版的《设计模式》一书,第一次将设计模式提升到理论高度,并将之规范化。书中一共总结了23种基本的设计模式。而这23中设...
  • Before_Morning
  • Before_Morning
  • 2015年09月11日 09:32
  • 252

design model

  • roj65
  • roj65
  • 2009年06月16日 22:06
  • 142

MyEclipse设置XML显示格式

MyEclipse设置XML显示格式 刚装了MyEclipse,但是XML文件显示成“树形状”,我想设置成文档型,容易查看和编写。 网友回复:窗口左下脚 design:树结构 source:文本结构网...
  • jifeijixufly
  • jifeijixufly
  • 2009年10月25日 19:08
  • 1194

the design of tivoli schedule

====================== =======================SCHEDULE   AUSUUWPHNDM1#JOBSTREAM1   DESCRIPTION “thi...
  • shenghuiping2001
  • shenghuiping2001
  • 2009年08月10日 13:34
  • 382

将Doc/View 应用程序打造成 ActiveX 控件

众所周知,MFC提供了一个非常强大的,但是又不太容易理解的编程模型叫做文档/视图结构。它的基本思想就是将数据的表现和数据的存在分开管理。MFC提供了很多现在的类来达成这个目标,通常,利用CFrameW...
  • prolibertine
  • prolibertine
  • 2006年12月19日 08:11
  • 2063

ant.design实践手札之---ajax数据调用

今天正好在弄项目的ajax数据调用情况,趁热打铁记录下实际的运行步骤状态1、创建一个对应的对象model、service、routes、mock作为一个简单的ajax的准备工作/src/models/...
  • xupeng874395012
  • xupeng874395012
  • 2017年01月20日 16:26
  • 3359
内容举报
返回顶部
收藏助手
不良信息举报
您举报文章:Design to Schedule Model
举报原因:
原因补充:

(最多只允许输入30个字)