1. Purpose of transfer control
Transfer control - Transfer control is used to define parameters for partial costing. The purpose of partial costing is to prevent the system from creating a new cost estimate for a material when costing data already exists. Instead, the existing costing data is simply transferred into the new cost estimate. This improves performance.
2. Customization
Menu path:
1. Define transfer control
2) Assign transfer to costing variant
In customizing of costing variant, you can select a transfer control (OKKN), or you can leave it blank.
3) Determine if transfer control can be changed by user