Catalogues
- 1 Project Burnout Map (empty)
- 2 Abstract
- 3 Introduction to the prediction blog
- 4 Functional acceptance requirements for the project's study abroad information sharing website
- 5 The content of the specific new features added and the arrangement of the sprint plan
- 6 Specific Personnel Assignment
- 7 Conclusion
This assignment belongs to which course | EE308FZ Software Engineering https://bbs.csdn.net/forums/ssynkqtd-04 |
---|---|
Where this assignment is required | https://bbs.csdn.net/topics/617676810 |
Team name | FZU Flying Club |
The goal of this assignment | Help students understand Beta Sprint and promote course project progress |
Other references | None |
1 Project Burnout Map (empty)
2 Abstract
As the Beta Sprint project is about to get underway, we had a meeting to plan out the specific division of labour for the Beta Sprint and the arrangements for writing the associated blog. This blog will forecast the likely direction of the Beta Sprint, as well as the challenges and opportunities our team may face in the process.
3 Introduction to the prediction blog
The Beta Sprint is a pivotal moment in the development of our project and we look forward to further refining and optimising our product during this phase. By summarising the previous Alpha Sprints, we have identified areas for improvement, and the Beta Sprint will be a concrete stage in realising these improvements.
4 Functional acceptance requirements for the project’s study abroad information sharing website
In the Beta Sprint, we will mainly focus on the core functionality of the Study Abroad Information Sharing Website to ensure its smooth operation and user-friendliness.
Specific functional acceptance requirements include:
4.1 Information publishing and browsing
Optimise the information publishing process to ensure that users can easily share and browse study abroad related information.
4.2 Search and Filtering
Provide efficient search and information filtering functions so that users can quickly find the study abroad information they need.
4.3 User Feedback
Setting up a user feedback channel in order to keep abreast of users’ needs and problems.
5 The content of the specific new features added and the arrangement of the sprint plan
5.1 Sprint Plan I Day1-Day3
Collect most of the cases and deploy their related cases on the website first (including cases related to 2023fall, 2024fall, study abroad, graduate school, public examination, and so on).
5.2 Sprint Plan II Day4-Day6
Implement the function of displaying the number of website visitors;
Continue to collect relevant cases, deploy relevant cases to the website, and update the status of application cases for 2024fall in a timely manner (senior students are still in the application season)
5.3 Sprint Plan III Day7-Day10
The construction of the website’s case tag column and the implementation of the case jump function so that users can retrieve the reference cases they need in a timely manner.
6 Specific Personnel Assignment
6.1 Plan 1: Deployment of Cases
Deployment Team Members
- Liu Yiqi
- Yin Xiangbin
- Chen Zhengang
- Zhang Jiayang
- Chen Yuheng
- Chen Jinghua
- Zhang Qin
Case Collection and Modification Team Members
- Zhang Qin
- Zhao Pan
- Peng Houming
Blog Writing and Graphics Team Members
- Zhang Qin
- Yi Li
- Hu Jiachen
6.2 Plan 2: Website Traffic Display
Deployment Team Members (Ongoing)
- Liu Yiqi
- Yin Xiangbin
- Zhang Jiayang
- Chen Yuheng
Case Collection and Modification Team Members
- Zhang Qin
- Zhao Pan
- Peng Houming
Website Traffic Display
- Chen Zhengang
- Chen Jinghua
Blog Writing and Graphics Team Members
- Zhang Qin
- Yi Li
- Hu Jiachen
6.3 Plan 3: Deployment of Tags and Navigation Bar
Deployment Team Members (Ongoing)
- Zhang Jiayang
- Chen Yuheng
- Chen Jinghua
Case Collection and Modification Team Members
- Zhang Qin
- Zhao Pan
- Peng Houming
Deployment of Tags and Navigation Bar
- Chen Zhengang
- Liu Yiqi
- Yin Xiangbin
Blog Writing and Graphics Team Members
- Zhang Qin
- Yi Li
- Hu Jiachen
7 Conclusion
Through these three sprint blogs, we will delve into all aspects of the Beta Sprint Programme to provide readers with a comprehensive understanding and outlook. It also makes our FZU Flying Book website more complete. We hope that through the Beta Sprint, we can enhance the social well-being created by our website and improve the usefulness of our website’s functionality, as well as improve the user experience. It is hoped that by working together, our project will make great strides in the Beta Sprint.