Preparation for everything

The next stage requires improvements and new features

1.Optimize program for fluency and stability

2.Beautify program interface

3.Develop a multilingual interface

Team division of labor needing improvement

In the Alpha sprint stage, we mainly divide the team members according to the front and back ends and different pages and functions; In the Beta sprint phase, we will make some changes to the division of labor of team members. There will be no division of functions based on implementation, but will be collaborative and collaborative ways to improve the program.

Blog planning

Team memberReport division
Liu QinyangLeader
Liang WeiquanTop-of-the-line collection of essays in the Beta stage
Zhong RuichengBeta sprint essay
Yang ZhilinSummarizing issues in the alpha stage
Shen JunzheBeta sprint essay
Gan TinghanDefense PPT
Chen SishengTeam's code standards
Zhao HaonanDemostration and defense.
Ye QuanhuiBeta sprint summary essay
Chen GuantingBeta sprint essay
Zhang HongUsage survey report
Huang YichengPrepare for everything

Sprint planning

DateTask
DAY 1-2Optimize program for fluency and stability
DAY 3-4Beautify program interface
DAY5-6Develop a multilingual interface
DAY 7Debug

评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值