Which course does this assignment belong to | 2301——MUSE Community |
---|
Assignment Requirement | Teamwork-Beta Sprint |
Team name | Wizards_of_codes |
The Aim of This Assignment | To finish the first Beta Sprint Essay and recording some details |
Other Reference Documents | none |
I. Meeting Photo

2. Progress and GIF
Check in history after you check in

3. Experience
Team member | Progress | work remaining |
---|
Liu Qinyang | Improve the responsive design of login and registration pages. | Complete the design of product display interface |
Liang Weiquan | working on conceptualize the user interface architecture | Make it more simple and beautiful |
Zhong Ruicheng | Realize real-time course update (refresh) in the course display interface | make switch more smooth |
Yang Zhilin | Optimized UI design and added user-friendly interactive elements. | Some devices still have some inconsistencies |
Shen Junzhe | Some protection measures are taken against possible vulnerabilities in the back end | Test for possible vulnerabilities |
Gan Tinghan | Assisted in completing front-end pages using WeChat small program. | Improve interaction and increase fluency |
Chen Sisheng | Defined additional page components and service tools. | Try adding more useful components |
Zhao Haonan | Implemented key API interfaces and conducted testing | Improve error handling mechanism and continue developing new API interfaces |
Ye Quanhui | Learning and using WeChat small program development software | have room for improvement |
Chen Guanting | Assisted in the initial design of the display page. | Reduce the load gap |
Zhang Hong | Completed the basic framework of the back-end service and initiated API implementation. | Develop back-end APIs |
Huang Yicheng | Improved the database model and optimized API interface design. | Optimize code to enhance database performance |
4. Burnout Diagram

5. Images of The Check-in Record
