Main difference between the MRP type(PD/MPS/M0)

原文:Main difference between the MRP type(PD/MPS/M0)

翻译:MRP的三种类型(PD/MPS/M0)的主要区别

 

  When running MRP using transaction MD02 and MD41, what the difference should be?

  There is no difference in the processing logic as such. The only difference is that MPS only acts on materials with an MRP type relevant to MPS (e.g. M0, M1, etc...), and MRP acts on materials with an MRP type relevant to MRP (e.g. PD). How the materials are processed is exactly the same.

  This functionality allows you to run MRP for 2 sets of materials separately (and with a different frequency).

  For example, some businesses may do planning for their finished goods once per week, but would want to run MRP for their components daily (although this is generally not necessary with SAP). So, for this example, you would define all finished goods with an MRP type relevant for MPS, and all components with an MRP relevant.

 Basically, MPS is a form of MRP that concentrates planning on parts or products that greatly influence the company profits or those that require critical resources. Items marked as master schedule items can be finished goods, assemblies or raw materials. These items are selected for separate MPS run that takes place before the MRP planning run. MPS run is executed without any BOM explosion. This is to allow the MRP controller to ensure that the master schedule items are correctly planned before any detailed MRP run take place.

  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值