052-231(新增70题2018)

You find today's performance of your production database to be the best ever. Therefore, you want to be notified in the future whenever the performance degrades by 10% of today's performance.

What is the first step that you would take to ensure this?

A. create baseline metrics for today's performance

B. write the current database metrics to a database table and create a trigger to compare with future database statistics

C. write the current database metrics to a flat file and create an operating script to compare with future database statistics

D. write the current database metrics to a database table and create a procedure to compare with future database statistics

E. write the current database metrics to a database table and submit a job using DBMS_JOB to compare with future database statistic

Answer: A

Baselines

baseline contains performance data from a specific time period that is preserved for comparison with other similar workload periods when performance problems occur. The snapshots contained in a baseline are excluded from the automatic AWR purging process and are retained indefinitely.

转载于:https://www.cnblogs.com/Babylon/p/8621846.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值