difference between Date Expected and Date Physical

Date Expected and Date Physical are different in concept wise but the values may or may not be same.

Date Expected will be generally Shipment date in case of sales order and delivery date in case of purchase orders.

Date Physical is the date of physical posting into the system. In case of sales order it is the packing slip posted date.(the date when the inventory is reduced physically)

In case of inventory journals the date physical and date expected will be one and same...

转载于:https://www.cnblogs.com/yougyoum/archive/2012/09/11/2679980.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值