Redo Logging I/O-Related Wait Events

'log file sequential read' and 'log file single write'


Both these Wait Events are I/O-related so they are likely to appear together with 'log file parallel write' if there is I/O contention on the redo logs. Follow the same guidelines for tuning them.

'switch logfile command' ,'log file switch completion' and 'log file switch (clearing log file)'


More LGWR I/O-related Wait Events, tune as before.

'log file switch (checkpoint incomplete)'

This Wait Event occurs when checkpointing activities are not occurring quickly enough. 
For guidelines on tuning checkpoint operations please refer to:

Document 147468.1  Checkpoint Tuning and Troubleshooting Guide
Document 76713.1  8i Parameters that Influence Checkpoints
'log switch/archive' and 'log file switch (archiving needed)'

These Wait Events occur when archiving is enabled and indicate that archiving is not performing fast enough.
For guidelines on tuning archiving operations please refer to:

Document 45042.1  Archiver Best Practices

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/29337971/viewspace-1816627/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/29337971/viewspace-1816627/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值