All of the above are the works that we need to do after the shutdown of concrete mixing plant. Any details can change the future, so we must make timely relevant maintenance and coordination when inspecting the concrete mixing plant. Check the conveyor belt surface of concrete mixing plant and replace the conveyor belt if it is desquamated or ruptured. If the concrete mixing plant will have a long shut down time, then the residuary materials are not allowed to remain in the feeding hopper or stock bin.
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows: Twin shaft concrete mixer, concrete block making machine,etc. We will provide you with the best product and service.
The concrete batching plant construction site generally concentrates a large number of operating personnel, construction equipment, materials, and so on. So the security is the problem that must be firstly ensured by enterprises. After the shutdown of concrete mixing plant, we should check the wear pattern of mixing arm and lining plate, check whether it is necessary for us to lubricate or replace the parts, and check to see if the screws are loose. The first thing we need to do is to shut down all the places needing to be closed off, and we should also ensure the correct sequence.
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/29640841/viewspace-1434864/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/29640841/viewspace-1434864/