From the following several aspects to introduce
concrete batching plant equipment maintenance CaoZuoJi matters, the main contents of seven points:
1, please read random various specification. According to the relevant provisions of the manual operation, use and maintenance.
2, operating room of the power distribution cabinet and equipment subject should have reliable grounding measures, the user according to the design specification requirements to install lightning protection device.
3, please in strict accordance with the instructions of the provisions of the table of lubrication requirements, regular well equipment bearing, deceleration machine parts of the lubrication maintenance work, especially note: air compressor in the work to keep oil level in oil mark online, the oil level below the oil mark lower limit, must add new compressor oil (summer, winter with 19 with 13 compressor oil) is prohibited in oil free state work, every week should be clean air compressor filter once, first used in oil, 100 hours after each use 1000 hours in oil, every day two open thick oil pump, to the shaft end seal oil supply.
4, after the project before use check check the electric device is safe and reliable, the stroke switch action is agile and reliable.
Check the air compressor holding device is normal, pressure is stable in the 0.5-0.7 between Mpa.
Check the weighing hopper is in a free state, the interference phenomenon is happening.
5, per shift work of maintenance project please in addition to stir within the host sundry and scrap, thoroughly wash mixing tank bond; Check the agitating vane and plate clearance.
Concrete mixer,
block making machine
Adjust fastening and fastening stirring arm and shaft coupling bolt; Cleaning additive storage bin precipitation.
Winter construction should put even though the water way; Put all the air compressor gas storage in the compressed air and water.
The lubrication part filling oil check air two conjoined of oil mist in the vessel if there is oil, atomization is normal, gas circuit system if there is a leak phenomenon.
Check the electrical system within the electrical components have damage phenomenon; If there is damage to repair or replace.
Check the wire rope wear, and in the surface amount daub grease (butter).
After stopping off computer power and total power.
6, periodic maintenance overhaul project check blade, liner wear, and take into consideration the replacement.
The drive gear for inspection, and appropriate daub grease.
Perfect operation management systems and improve the operation records and exchange class record.
7, safety operation caution hopper ascension, it is strictly prohibited to anyone in the bucket to stay below: it is strictly prohibited to overload operation and loading start.
Mixing equipment work, concrete discharge area it is strictly prohibited to stand.
Mixing equipment repair, must the general power off and put up signs.
It is strictly prohibited to the operator optional operating handle and button.
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/28646029/viewspace-754463/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/28646029/viewspace-754463/