HP HP0-W03 Exam

Exam Number/Code : HP0-W03 Exam Name : Advanced SAN Architeture Questions and Answers : 74 Q&As Update Time: 2010-04-10

1. What are typical consequences of insufficient knowledge transfer to the customer for their SAN environment?
(Select two.)
A. unused bandwidth
B. wasted disk space
C. management errors
D. event misinterpretation
E. unnecessary FC data traffic
Answer: CD


2. What is the customer's responsibility rather than the SAN architect's?
A. data availability
B. data protection
C. SAN scalability
D. SAN protection
Answer: D


3. Which zoning type must be used in a heterogeneous fabric with M-Series and B-Series switches?
A. VSAN zoning
B. name server zoning
C. fabric address zoning
D. domain-port-area zoning
Answer: B


4. A customer has asked you to implement VSANs in a C-Series fibre channel switch fabric. What is a unique feature
of VSANs?
A. It allows you to apply different fabric settings in one switch.
B. It allows you to connect different vendor switches to one infrastructure.
C. It allows you to configure more than one management IP address per switch.
D. It allows you to minimize oversubscription on connected ISLs through path load balancing.
Answer: A


5. Which task must be performed prior to starting a merging process between two switches? (Select two.)
A. Remove duplicated domain IDs.
B. Set port speed of ISL ports to a fixed value.
C. Disable zoning configuration on both switches.
C. Disable zoning configuration on both switches.
D. Enable the same passwords on both switches.
E. Check to see if the same feature licenses are installed.
Answer: AE


6. What are the primary responsibilities of the SAN architect? (Select three.)
A. ensuring data protection
B. ensuring data availability
C. solving revision conflicts
D. solving SAN scalability issues
E. solving management problems
F. ensuring database consistency or validity
Answer: ABD


7. What is considered during the SAN architecture process? (Select three.)
A. hardware shipping dates
B. built-in SAN management
C. future customer requirements
D. product-related implementation
E. integration of old storage systems
Answer: BCE


8. You are implementing an extended SAN infrastructure between two data centers which are 9km apart. HP
StorageWorks Edge Switch 2/24 is used in this environment. Which ports could be used to connect the ISL between
this data centers?
A. All ports support links for this distance by default.
B. You must enable the extended ISL ports individually.
C. The first four ports can connect a long-distance ISL.
D. Long-distance ISL ports must be unlocked by a license.
Answer: C


9. What benefit does the customer gain from the SAN assessment?
A. the awareness of current IT management issues compromising the business
B. a strategic roadmap identifying components and costs associated with SAN technologies
C. the impression that the IT infrastructure is not up to date and must urgently be reorganized
D. detailed knowledge of the current IT inventory and all implementation bugs and management mistakes
Answer: B


10. What must a SAN architect know to assess the data streams for a given SAN?
A. total port count
B. application behavior
C. RAID implementation
D. used storage capacity
Answer: B


11. During the SAN architecture process, the SAN architect must explain to the stakeholders how the new
infrastructure will be realized. Which information should this explanation contain?
A. options that can be installed at a later time
B. current SAN components that will be utilized
C. details about storage and SAN management
D. overview of HP multivendor support services
Answer: B


12. What is the outcome of the SAN architecture process?
A. detailed SAN implementation plan, maps, and guidelines
B. timeline for SAN deployment based on staff requirements
C. framework for making all choices for the storage infrastructure
D. cost-benefit analysis for the SAN based on requirements and growth
Answer: C


13. Which fabric migration path is shown in the exhibit?
A. meshed to tree
B. cascaded to tree
C. cascaded to meshed
D. meshed to cascaded
Answer: B


14. Where do you install the HP Cluster Extension (CLX)?
A. on the switch as a license
B. on all servers in the cluster
C. on one cluster server at each site
D. on the same server as Command View
Answer: B


15. Customer infrastructure assessment involves evaluation of the IT employees' skills. What is the primary purpose of
evaluating the employees' skills?
A. identification of adequate management software
B. recommendation of required employee changes
C. development of adequate SAN management disciplines
D. recommendation of an adequate service level agreement
Answer: C

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/23942882/viewspace-663606/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/23942882/viewspace-663606/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值