vue 结束项目命令_结束项目

vue 结束项目命令

You are about to close the project, you must do this with full focus to understand and document lessons learned for the entire project.

您将要结束该项目,您必须全神贯注地执行此操作,以了解并记录整个项目的经验教训。

In the scrum terminology, this is called a retrospective. You can invite additional stakeholders to the retrospective to look at the project seriously. Once the project retrospective is completed, you can now start the final closeout for the project.

用scrum术语来说,这称为回顾。 您可以邀请其他利益相关者参加回顾会议,认真研究该项目。 项目回顾完成后,您现在可以开始该项目的最终清算。

You have reached this point in the project based on the condition that all the required features have been implemented.

根据已实现所有必需功能的条件,您已经在项目中达到了这一点。

As you have spent your time and funds on the project, you'll have a few extra things to consider before closing down the project. You need to look into the backlog list and work with the business to get the importance of the remaining features. In addition, you'll need to find out if there were new features the business would like to have implemented.

由于您已在该项目上花费了时间和资金,因此在关闭该项目之前,您还需要考虑一些其他事项。 您需要查看待办事项列表并与业务部门合作,以获取其余功能的重要性。 此外,您需要确定企业是否希望实施新功能。

If the set of backlog features are important and there are additional new features to be considered, it's possible a new project is warranted if the funds can be acquired. If the backlog contains lower priority features, it is likely a new project will not be initiated.

如果这组积压功能很重要,并且还需要考虑其他新功能,那么如果能够获得资金,则有可能需要一个新项目。 如果待办事项包含优先级较低的功能,则很可能不会启动新项目。

In this situation, the backlog needs to be transitioned to someone who can implement those changes. Another approach the business may want to take is, let's wait and see. If the backlog is important but they don't have a lot of new features at this time the business may want to wait several months to determine if new features surface and a new project is warranted. Regardless, it's very important for the backlog list to be given back to the business so they can maintain the list until future decisions are made.

在这种情况下,积压需要转移到可以实施这些更改的人员。 企业可能要采用的另一种方法是,让我们拭目以待。 如果待办事项很重要,但此时他们没有很多新功能,则企业可能要等待几个月,以确定是否有新功能浮出水面,是否需要进行新项目。 无论如何,将积压清单退还给企业非常重要,这样他们就可以维护清单,直到将来做出决定为止。

You can focus on the overall effectiveness of the project, versus all the details that occurred since the beginning of the project, and can reflect on the improvements you have made, as individuals, and for the business.

您可以将重点放在项目的整体有效性上,而不是自项目开始以来发生的所有详细信息,并且可以反映您作为个人和业务所做的改进。

翻译自: https://www.studytonight.com/scrum-framework/closing-the-project

vue 结束项目命令

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值