【翻译自mos文章】OGG的Director界面 显示mgr进程是红色的叉号,其实mgr是up的状态


来源于:Director Web Shows Process Down When It Is Up (文档 ID 1576563.1)

适用于:
Management Pack for Oracle GoldenGate - Version 11.1.1.1.0 and later
Information in this document applies to any platform.

症状:
OGG的Director界面 显示mgr进程是红色的叉号,其实mgr是up的状态

译者注:mgr进程是红色的叉号,此时mgr进程下面的抽取、传输,应用进程是根本不会显示的。

原因:
这是一个 director server 和 OGG host之间 连接的问题

解决方案:
若是 director界面显示的进程状态不变:

1. In the Director Admin Tool, test the connection to the OGG host.  Is it successful?
2. Is there a firewall between the Director server and the OGG host?  Did the configuration of the firewall change?
3. Check the ggserr.log on the OGG host.  You should see Director connections through GUI and MGR spawn a communication port for Director:

2013-07-30 18:13:18  GGS INFO     301  GoldenGate Manager for Oracle, mgr.prm:  Command received from GUI on host 0.0.0.0 (START GGSCI ).
2013-07-30 18:13:18  GGS INFO     302  GoldenGate Manager for Oracle, mgr.prm:  Manager started 'ggsci' process on port 7938.

4. Check the Director logs for connection issues to the OGG host:
a. Domain.log from <director install>/domain/servers/<hostname>/logs/
b. <hostname>.log from <director install>/domain/servers/<hostname>/logs/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值