管理项目问题

From "Absolute Beginner's Guide to Project Management 2nd Edition"

管理项目问题

Managing Project Issues

 

Projects are dynamic, projects often dealwith the “new” and the “leading edge,” and projects involve people. As aresult, circumstances are going to change, misunderstandings occur, assumptionsdon’t hold, political agendas collide, problems arise, and risk events happen.These situations are categorized as project issues, and they all have the potentialto adversely affect the project’s ability to accomplish its objectives.

 

AdministrativeProcess Principles 管理流程原则

 

To properly manage project issues, thereare a few administrative fundamentals to adhere to:

Document the issues 记录问题—You need somewhere to log the issues as they are identified. We’lldiscuss the log details later on.

Track until closure 跟踪指导解决—Use the log to make sure issues remain visible until they areresolved.

Align with project needs 与项目需要保持一致—Ensure theoverall process matches the communication and workflow needs of the project.

Cost-effective approach 采用成本效率比好的解决方法—Keepthings in perspective. Don’t buy a BMW when a Chevrolet is all you need.

 

 

BestPractices 最佳实践

 

The work of project issue management is straightforward.However, there are several techniques that are proven to be effective and will helpyou avoid the common mistakes in this aspect of project control.

Assign Unique ID 分配唯一的IDMake sure to assign a unique number to each logged issue. Thissimplifies the ongoing communication and tracking process.

Assign one person responsible 指定专人负责—As with otherwork tasks, assign a specific person responsible for any follow-up action itemsand for complete resolution to the issue.

Facilitate resolution to complex issues 协调解决负责问题—Thereare times when issues do not have a clear owner or will need the collaborationof several parties to resolve. As the project manager, you must either assignsomeone to facilitate this process or take ownership of the facilitationprocess yourself.

Resolve issues at the lowest level 尽量在问题处在低优先级的时候将其解决—Alwaysattempt to deal with problems at their lowest level. You can resolve issues fasterand at less cost. More importantly, you will earn the confidence of upper managementby protecting their time and only engaging them when it is warranted. Again,make sure to establish the escalation triggers with your senior management stakeholdersduring planning, so you are clear about their expectations.

Go after root cause”寻找问题的根源—A common error in dealing with issues is not to deal with the actualsource of the problem (root cause). Sometimes, political reasons may hamperyour efforts to deal with the root cause, but whenever possible, do the properanalysis to get to the real problem, and address it. If you do not, the issuewill likely return for another visit.

Get buy-in on due date and ownership 在完成日期和负责人上达成一致—Applythe same approach to assigning issues, as you do (or should) with assigningscheduled work tasks. For better issue management, make sure to

spend the time with the person designated totake action on the issue and get their agreement on when they can have theaction completed and that they are the right person to do it.

Adapt process and data points 采用流程和数据点—Even if yourorganization has a standard approach or methodology for issue management, don’tbe afraid to adapt the workflow process or the tracked data points to betterfit the needs of the project.

Review issues frequently 时常回顾—At a minimum,review any outstanding issues during each status review meeting (this should beincluded in your Communications Plan). As a good practice, follow up onoutstanding issues every day and make sure the necessary steps/actions areoccurring to get to a resolution.

Train project team on process and tools 对项目组进行流程和工具的培训—This is not as important for projects where the Issue Log is more amanagement tool just for the project manager (you). However, in any situationwhere collaboration tools are being utilized or multiple people are involved inthe process, make sure the project team is properly prepared to leverage thesystem.

 

 

 

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
<h3>回答1:</h3><br/>针对一个project项目项目管理案例作业主要是为了让管理者通过研究实践案例,总结出项目管理的经验和方法,以便更好地指导实际工作的开展。整个作业通常包括以下几个部分: 第一部分是案例描述。这一部分要求深入了解项目的背景、目标与目的、范围、期限和质量标准等情况,了解项目中的风险和机会,并描述重要利益相关方的期望和影响。 在第二部分中,需要对项目管理的过程和方法进行分析,探索项目进展的原因。通过调研、分析、对比等手段,寻找管理成功或失败的原因,并分析其背后的成功或失败的原因。 第三部分是经验总结。通过上述过程的观察和分析,结论应该能被推广至经验值,并说明给他们的潜在用途和限制。这部分要求我们有能力总结出项目管理易犯的错误,并提出可以改善的建议。 在最后一部分,需撰写评估和选择的版本。评价要求我们分析和评价利弊分析,确定优点和缺点,并可以给出制定计划的建议,从而全面阐述项目管理的可行性和可操作性。 总之,project项目管理案例作业是重要的实践和实践和实践和实践和实践和实践和实践和实践和实践和实践,对管理层的继续发展和提高都具有重要的意义。 <h3>回答2:</h3><br/>在项目管理领域,一个成功的项目需要有一个良好的项目管理计划。下面是一个真实的项目管理案例,以帮助解释为什么项目管理在实现项目目标方面至关重要。 在一个公司中,一个项目组负责开发一款新产品。该项目组由开发人员、测试人员、设计师和项目经理组成。这个项目面临着众多的挑战,如时间限制、资源不足和不稳定的需求。在项目开始时,项目经理提出了一个详细的项目计划,包括时间表、预算和资源分配。该计划随后被提交给上级管理人员批准。 当项目开始时,项目经理开始监督项目的执行情况。他与团队成员保持沟通,识别问题,并及时采取措施解决问题。在整个项目的执行期间,项目经理定期召开会议,更新计划,协调资源,给出项目进度报告并确保任务按时完成。 在执行的过程中,项目团队遇到了许多问题,包括测试的延迟、开发人员离职和顾客需求变化。但是,由于有一个比较充足的项目管理计划,项目经理和团队能够及时地解决这些问题并保持项目按计划进行。 在项目完成时,产品成功地推向市场,并赢得了很好的反响。所有的产品质量问题都得到了及时解决并得到了及时修复。管理层也对项目的成功进行了认可,并对项目团队及项目经理的工作表示赞赏。 该案例再次证明了一个好的项目管理计划,对于项目成功至关重要。项目经理和团队需要密切合作,准确估算和规划时间、预算和资源,及时识别和解决问题,并保持监督,以保证项目成功。 <h3>回答3:</h3><br/>项目管理是一门重要的管理学科,其主要是为了实现项目目标,完成项目任务和优化项目资源。在实际项目管理中,需要制定合理的项目管理计划和执行方案,对项目进度、成本和风险等进行有效的管理和控制。 以下是一个关于项目管理的案例作业: 假设公司要开发一个新软件产品,该产品需要包括几个模块,每个模块的设计和编码都需要耗费不少的时间和精力。对于该项目,以下是项目管理的一些关键任务: 1. 项目团队组建 首先,需要将相关的团队成员招募进来,例如软件设计师、程序员、测试人员和项目经理等。管理者应该充分考虑每个团队成员的背景、经验和技能等因素,以确保团队人员的专业能力和协同工作能力。 2. 项目计划制定 在项目启动阶段,需要制定一个详细的项目计划,该计划应包括项目大纲、任务分配、时间表、成本预算、风险管理项目进度控制等方面。这有助于对整个项目的方向和目标进行规划和指导,将有助于有效地实现项目目标和利益。 3. 项目进度与资源协调 由于该项目涉及到很多模块和团队,因此需要进行进度控制和资源协调,以保证整个项目的顺利进展。这有助于帮助管理者及时发现和解决问题,减少项目延误和资源浪费。 4. 成本管理项目贯彻执行过程中,需要对项目成本进行管理和监控。管理者需要对项目成本的投入和产出,物料和人力成本进行分析、评估和管理,以确保项目保持费用效益和货币效益。 5. 风险管理与应急预案制定 在项目过程中,可能面临各种类型的风险,如技术风险、时间风险、成本风险和市场风险等。管理人员需要在项目计划和执行中定义和评估风险,制定应对措施和灾难计划。 总之,科学合理的项目管理可以提升项目的成功率,保证项目的顺利执行。在不同的项目中,项目管理的重点和难点也不同,需要制定对应的项目管理计划和方案。

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、C币套餐、付费专栏及课程。

余额充值