html禁用home,home.html

Welcome to the website of the Chicago & Aurora Divisions. This is a HO Scale representation of the Chicago Burlington & Quincy's Chicago to Aurora triple track mainline along with the Chicago & Iowa Subdivision (C&I) mainline from Aurora, Illinois north to Savanna, Illinois (as staging) through such cities as Rochelle, Flag Center, and Oregon.

The layout is set in 1954 and much research has been put into making the layout as close to 100% accurate to the real CB&Q in 1954 as possible. In 1954 the CB&Q still operated some steam on the Chicago and Aurora Divisions, with 2-8-2s, 4-8-4s and 2-10-4s on freight trains and 0-6-0s and 0-8-0s in yard service.  The arrival of E-8s between December 1949 and September 1953 marked the end of steam locomotives in passenger service.  There are monthly operating sessions.  The operating schedule for the layout is taken from actual CB&Q 1954 Chicago and Aurora Divisions employee time tables. The layout uses a car card system, with each car being waybilled from an accurate shipper to prototypically correct industries and destinations. A typical operating session will call for  a minimum of 54 trains including 12 suburban service trains (“Dinkies”), 12 manifest freights, 19 passenger trains and 3 locals.

ebfe0f2300bbdcaad0c5c7e3f704306e.png

41985e72edee24e238d1a404fafd9c66.png

855e39ad0203d5b7fdeaae3d4a8e5739.png

Any questions, comments or concerns feel free to email the Chicago & Aurora Divisions Superintendent: Mike Spoor- cbqrr@comcast.net

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值