Powerful Function of Hammer Crushers

Production in the course of 2006 totalled 97.2Mt of iron ore , of which 79.2Mt was sourced from Paraburdoo, Mount Tom Cost, Marandoo, Brockman and Yandicoogina, 8.2Mt came from the Eastern Range operation, and 9.8Mt came from the Channar joint venture.

Total shipments from the company’s ports had been 98.1Mt, an all-time record, driven largely by further increases in demand for iron ore from China. Rio Tinto also has a 53% holding inside the Robe River iron ore properties (Pannawonica and West Angelas), also in the Pilbara, which produced a further 52.9Mt of ore in the course of 2006.

In early 2008 Rio Tinto additional strengthened its leading position in the region using the discovery of a significant, new resource at Caliwingina (875Mt at 56.9% Fe).

The Caliwingina resource is inside the Mt Pyrton Project area which lies 100km northwest of Tom Value. It really is situated inside the Late Archaean to Early Proterozoic (2,765–2,470Ma) Hamersley Basin.

Geology and reserves

The Hamersley iron resources, contained in banded iron formations of precambrian age, cover extensive areas of the Pilbara region. Haematite would be the principal iron mineral.

In the first quarter of 2010 proven and probable reserves at Hamersley’s Pilbara operations yielded three,344Mt of saleable ore. The Robe River operations had a further 696Mt of proven and probable ore, grading among 57.2% and 62.2% iron. Rio Tinto also has substantial undeveloped resources in the Pilbara, at the same time as a 50% interest in the Hope Downs joint venture that was completed in 2008.

Mining

All of Hamersley Iron’s mines are standard open pits. Material is drilled and blasted in benches, blast holes getting charged with an ammonium nitrate/fuel oil (ANFO) mixture and heavy ANFO dispensed by bulk explosive trucks. Ore is loaded into haul trucks by shovels, hydraulic excavators or front-end-loaders, and transported for the main crusher. It really is then processed in a crushing and screening plant to create fine ore and lump ore.

At Marandoo, four pits are operational and others will be brought into operation inside the future.

The low bench height (10m), compared with Mount Tom Value (15m) and Paraburdoo (14m), facilitates selective mining and minimises dilution, but equipment is smaller than at Hamersley’s other operations.

Brockman enhances the stability and flexibility of Hamersley operations and raises the proportion of lump in Hamersley’s item mix. It’s a contractor operation with management and grade manage coming below Hamersley’s direction. The deposit consists of detrital and conglomerate haematite.

At Channar, crusher feed comes from Channar Main Pit and Channar East, with Paraburdoo’s contribution to total production getting been lowered accordingly to retain continuous output as Channar’s has built as much as more than 10Mt/y.

As the professional manufacturer of complete sets of mining machinery, such as Artificial sand maker,Magnetic separator,Sand Washer,China cone crusher, Henan Hongxing is always doing the best in products and service.

转载于:https://www.cnblogs.com/liajones/archive/2012/02/16/2354573.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值