The Basic Data  

The entire measurement analysis procedure in Infosys depends on the basic data of effort and defects, which is captured in DART and RADAR. Any meaningful conclusions / decisions in a project can be derived based on milestone / metric analysis reports, only if these basic data is accurate. As per the process, DART is supposed to be used "online" and should be submitted weekly. RADAR entries should be made as soon as a review / test is completed, and should be tracked to closure.

Configuration Management

Adherence to the configuration management plan ensures that the team can focus on more productive work. It avoids such confusion and ensures that the Software going to be delivered is conforming to the requirements. It also assures that the code is reviewed, tested and is the correct version consistent with the other deliverables.

COQ 

Testing is a very important activity to be done with clear strategy. Effective testing should not be decided by the availability of bandwidth. There should be proper entry and exit criteria defined for testing. Increasing the testing effort arbitrarily does not give any additional benefit and decreasing it arbitrarily is highly risky. 


Defect Prevention 

Defect prevention is not just about Pareto charts and Fish bone diagrams. The most important thing is to identify, plan and implement the actions needed to eliminate the root causes of the defects. It is also important to verify whether right action is taken and improvement is happening.

Defect Logging 

It is not just sufficient to capture the number of defects caught in a review or testing.It is also important to capture the attributes of the defects like severity, type, stage injected, stage detected etc to derive meaningful conclusions. These attributes will also help during defect prevention to understand the root causes of the defects. Refer Defect classification guideline

The Project Plans

Project plan & Configuration Management Plan should be prepared at the early stages of the project reflecting the thought process of project manager on how he is going to execute the project. It creates the roadmap for project execution. Getting it reviewed by peers will help to leverage the experience of others. Project management standard of Infosys Quality system gives the timelines for the project initiation activities. Late preparation only adds to frustration.

Managing Your Risks 

Risk management is a process of identifying the risks in a project, prioritizing them and identifying the required mitigation steps. CMMi emphasizes on calculating the cost of the risk and cost of the mitigation steps so that a cost / benefit analysis can be done. This will help to decide on whether to implement the mitigation step or to accept the risk. QSD risk management guidelines should be used to identify the risks and to assign their probability and impact.

Goal Setting 

While it is a good practice to revisit the project goals based on the milestone analysis, caution should be exercised while doing that.
It is not required to revisit the project goals after every milestone / metric analysis. A high deviation on a particular milestone does not call for revisiting the goals immediately. A trend needs to be observed and a decision on revisiting the goals should be based on that.


转载于:https://www.cnblogs.com/lifz/archive/2006/04/25/384795.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值