OCP-1Z0-053-V12.02-512题 【转】

http://blog.csdn.net/gisinfo/article/details/8159875

1.Which two statements correctly describe the relationship among the Scheduler components: job, program,

and schedule? (Choose two)

A. A job is specified as part of a program definition

B. A program can be used in the definition of multiple jobs

C. A program and job can be specified as part of a schedule definition

D. A program and schedule can be specified as part of a job definition

Answer: B,D

实验:

SQL> desc dbms_scheduler.create_program
Parameter                                  Type           Mode Default?
-------------------                           -------------- ---- --------
PROGRAM_NAME                         VARCHAR2       IN           
PROGRAM_TYPE                          VARCHAR2       IN           
PROGRAM_ACTION                      VARCHAR2       IN           
NUMBER_OF_ARGUMENTS       BINARY_INTEGER IN   Y       
ENABLED                                        BOOLEAN         IN   Y       
COMMENTS                                    VARCHAR2     IN   Y       
 
SQL> desc dbms_scheduler.create_schedule
Parameter                         Type                     Mode Default?
--------------- ------------------------ ---- --------
SCHEDULE_NAME        VARCHAR2                 IN           
START_DATE                  TIMESTAMP WITH TIME ZONE IN   Y       
REPEAT_INTERVAL       VARCHAR2                 IN           
END_DATE                      TIMESTAMP WITH TIME ZONE IN   Y       
COMMENTS                     VARCHAR2                 IN   Y       

转载于:https://www.cnblogs.com/oraclesea/p/3835929.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值