SAP PP Using MRP Areas

SAP PP Using MRP Areas

http://sap123.com/a/57/


By Willem Hoek


Normally materials planning take place on PLANT level.

By using MRP areas -; specific storage locations can be grouped together and planning take place on that grouping (the MRP Area).

Example: Plant 3200 / Sloc 50 and Plant 3200 / sloc 51 in one MRP Area
This is done in Configuration.

When activated, materials can now be planned (MRP types, Lot size, etc...) per MRP Area. And MRP runs can also be done on MRP Area.

Consumption history will be kept on MRP Area level.

Material Master data

When creating / changing materials -; you will see MRP Areas in MRP1 view

http://sap123.com/files/f/136.gif


http://sap123.com/files/f/137.gif

Material data fields on MRP Area level
http://sap123.com/files/f/138.gif


How to use MRP Areas -; Running MRP

When you run MRP, you can run it either for PLANT or MRP AREA.

Example: For a material

  • For Plant 3200, set MRP Type = V1, ROP = 300

  • For MRP Area 3200_1 (within plant 3200), set MRP Type = V1, ROP = 100

    If we run MRP for Plant 3200, SAP creates a PR of qty 300 (because ROP = 300).
    If we run MRP for MRP Area 3200_1, SAP creates a PR of qty 100 (because ROP = 100)

    Consumption History

    Consumption History is stored on the lowest level either Plant or MRP Area level.

    If MRP Area = plant then Consumption History is available in
    Menu: Display Material (MM03) > Additional data > Consumption
    Example for plant 3100 (where MRP area is on PLANT)

    http://sap123.com/files/f/139.gif

    For MRP Area 3200_1, this information is accessed via MRP1 view.
    http://sap123.com/files/f/140.gif

    Tables where consumption data are stored:

  • Table MVER --> Plant Level

  • Table DVER --> MRP Area level

    Configuration to take place in order to use MRP Areas

    Start of by looking at SAPNet for notes on MRP Areas.

    Steps to follow:

    Step 1: Convert planning file entries (SE38 program RMDBVM00)
    THIS IS DONE ONCE OFF

    Program: RMDBVM00
    http://sap123.com/files/f/141.gif

    Step 2 Activate requirements planning for MRP areas
    http://sap123.com/files/f/142.gif

    http://sap123.com/files/f/143.gif

    Step 3 Define MRP Areas

    http://sap123.com/files/f/144.gif

    The Receiving storage location is the default sloc that will be in PR that was created by MRP.

    A MRP area consists of one or more storage locations. This is where they are defined.
    http://sap123.com/files/f/145.gif


    SAP version used for this post: SAP ECC (ERP Central Component) 5.0

    ----------- END OF POST -----------

     

     

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值