此步骤总结于大榕树Basis群的讨论记录,版权所有,严禁转载。
Basis巡检步骤:
v_顺风耳Jason(61262919) 8:55:07
df -m : check disp space, >80% warning,
v_顺风耳Jason(61262919) 8:58:14
sm51 :check all nodes are active.
v_顺风耳Jason(61262919) 8:59:02
entry every node by doulce click the item in sm51, check the logs.
v_顺风耳Jason(61262919) 8:59:18
/nsm21
v_顺风耳Jason(61262919) 9:04:51
st22 check abap runtime errors
v_顺风耳Jason(61262919) 9:06:39
sm13 check update errors
转载于:https://blog.51cto.com/moguiyang/775281