约定计算机网络通信实体如何通信的,●计算机网络中对等实体间通信时必须遵循约定的标准协议。不同的协.._简答题试题答案...

Usually business solutions have three main aspects:people, (67) ,and technology.Themaion reason for failing software projects has little to do with technology and tools,and much to dowith lack of process (68) .Experience has shown that introducing new technology and tools inan immature or undisciplined environment is likely to increase the chaos.CASE tools are notenough."A fool with a tool is still a fool!"

Structured method was the first wave of the software industry.This was the beginning oftransforming software development from a" (69) industry"to mass production.Softwareprocess movement if the second wave in the software industry.The process maturity movementprepares the way for the third wave of the software industry:"software industrialization".Softwaredevelopment will become like an assembly and manufacturing process.A cfiticalenabling factor is adisciplined software engineering process with predictable quality, (70) and functionality.

(66) A.forecast

B.preparation

C.budget

D.economy

(67) A.process

B.skill

C.organization

D.interface

(68) A.law

B.discipline

C.plan

D.evaluation

(69) A.college

B.family

C.workshop

D.cottage

(70) A.plan

B.schedule

C.effort

D.product

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值