SAP QM Auto Usage Decision

SAP QM Auto Usage Decision

Auto Usage Decision

If the goods in an inspection lot are confirmed to be free of defects in an inspection, the system can complete an inspection automatically, provided certain prerequisite conditions have been met.

Prerequisite.

The system can only make an automatic usage decision if the following conditions have been met:

  • No characteristic has been rejected in the inspection lot
  • All required characteristics have been confirmed and closed
  • No defect records exist for the inspection lot

Auto UD process is given Below.

Step 1.

SPRO > Quality Management > Maintain Setting at Plant Level.

In Plant dependent QM setting maintain wait time in Automatic usage decision tab as per the business requirement.

Waiting time :- The number of hours / mins entered here must have expired after creation of the Lot,before the system makes an automatic usage decision for the corresponding inspection lot.

Step 3.

In material master in QM view activate Automatic UD indicator for the inspection type.

Step 4.

QA01 > Create manual inspection lot for the material.

Inspection lot is created for the material of inspection type 09.

Step 6:-

QE01 > Perform resulting recording .

Result recording is completed for the characteristics.

Result recording is mandatory to perform Auto UD if required char indicator is activated for the characteristic.

Step 7

Execute T-code QA10 to perform Auto UD for the Inspection lot. You can also scheduled job.

Auto UD has been made successfully for the inspection lot.

https://blogs.sap.com/2016/08/26/auto-usage-decision/

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值