FANUC-关闭光栅尺参数及步骤说明
IIV From M-MG Kügel Helmut-ml -mp
No.: 37/2004 Date 19.10.2004 Page 1 of 5
To Mr. Hagenau
Regards: Changes to the Control Parameters as a Dr. Sesselmann
Consequence of Standardizing the LC to a
20 µm Grating Period and Discontinuing
IIV Distributor
the 100 µm Measuring Step
JH Info Professional
C:\WINNT\Profiles\a8164\Lokale Einstellungen\Temporary Internet Files\OLK52\37 LC Standardisierung auf 20 m Teilungsperiode-en.doc
Table of Contents
1. General Information1
2. Changing of the Signal Period of the LC 100 from 16 µm to 20 µm2
2.1 TNC2
2.2 SIEMENS2
2.3 INDRAMAT 2
2.4 Service Concept for the LC 181 2
3. Adaptation of the Measuring Step for Purely Serial Interfaces3
3.1 LC 400 and LC 100 at the Position Input (SDU) of FANUC Controls 3
3.2 LC 400 and LC 100 at Speed Input (Linear Motor) of FANUC Controls 4
3.3 Mitsubishi Controls5
4 Enclosure5
4.1 Excerpt from Page 5 of the Mounting Instructions for the LC 182 5
1. General Information
The changes to the LC 400 and LC 100 series will require some changes by the machine
manufactures in their current production. The 100 µm measuring step for all encoders with serial
interface has been removed from the sales program, and for the encoders with EnDat 2.1 interface
the signal periods will be standardized to 20 µm by the end of Feb