linux arm关闭光栅,FANUC-关闭光栅尺参数及步骤说明.pdf

FANUC-关闭光栅尺参数及步骤说明

IIV From M-MG Kügel Helmut-ml -mp

No.: 37/2004 Date 19.10.2004 Page 1 of 5

To Mr. Hagenau

Regards: Changes to the Control Parameters as a Dr. Sesselmann

Consequence of Standardizing the LC to a

20 µm Grating Period and Discontinuing

IIV Distributor

the 100 µm Measuring Step

JH Info Professional

C:\WINNT\Profiles\a8164\Lokale Einstellungen\Temporary Internet Files\OLK52\37 LC Standardisierung auf 20 m Teilungsperiode-en.doc

Table of Contents

1. General Information1

2. Changing of the Signal Period of the LC 100 from 16 µm to 20 µm2

2.1 TNC2

2.2 SIEMENS2

2.3 INDRAMAT 2

2.4 Service Concept for the LC 181 2

3. Adaptation of the Measuring Step for Purely Serial Interfaces3

3.1 LC 400 and LC 100 at the Position Input (SDU) of FANUC Controls 3

3.2 LC 400 and LC 100 at Speed Input (Linear Motor) of FANUC Controls 4

3.3 Mitsubishi Controls5

4 Enclosure5

4.1 Excerpt from Page 5 of the Mounting Instructions for the LC 182 5

1. General Information

The changes to the LC 400 and LC 100 series will require some changes by the machine

manufactures in their current production. The 100 µm measuring step for all encoders with serial

interface has been removed from the sales program, and for the encoders with EnDat 2.1 interface

the signal periods will be standardized to 20 µm by the end of Feb

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值