AMP Physical Link Creation And Disconnect

A flow diagram of the AMP link establishment and detachment of a connection between two devices is shown in Figure 4.47.



1 Physical Link Establishment

The process of establishing a Physical Link consists of 4 steps.

Step 1:Host A uses the BR/EDR Controller to request AMP_Info data from Host B in order to create an AMP connection. Host B gets this information from PAL B using HCI Read Local AMP Info. Host B returns the information to Host A over the BR/EDR radio.


Step 2:Host A send san HCI Create Physical Link command to its AMP Controller. AMP Controller A determines which channel will be used, and provides channel information to its Host. AMP Controller A joins or creates that channel. Note use of dotted rectangles for zero or multiple uses of read or write AMP_Assoc.


Step 3:Host A uses the BR/EDR radio to request a physical link to B. Host B tells its AMP Controller to accept a physical link from Device A.


Step 4: The AMP Controllers perform security operations. When the handshake is complete, both devices inform their Hosts that the link is ready for use. Note that the mechanism used to transport the authentication messages is defined by each PAL.


Step 5:Host A sends a Physical Link Disconnect command to its AMP Controller. AMP Controllers A and B do whatever AMP specific action is required to meet the request. Each AMP Controller sends the Physical Link Disconnect Complete event to its host. Both devices can now leave the AMP channel. Note that disconnection of any active Logical Links is not shown in Figure 4.52.


Step 6: During normal operation the AMP Controller may alert its Host to issues on the link.


评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值