1.ACCEPT_SCHEDULING_BY_DEFAULT
Check PartOps is exists or not when move the tasks on schedule.
2.ALLOW_OVER_SCRAP
It will threw exception when scrap qty > good qty
3.ALLOW_SPLIT_TASK_TO_SAME_RESOURCE
4.AUTO_SCH_CHECK_WO_DUE_DATE
Check WO Dure Date if there are multi molds(estimatedComplete must less than dueDate).
5.AUTO_SCH_HOURS_ALLOWED_TO_BE_DELAYED
Calculate operation dule date(hours)
6.AUTO_SCH_RES_WITH_SAME_PRODUCT_IN_PROCESSING_PREFERRED
Check Resource In Processing the Same Product
7.AutoChoosePassAfterScanned
LotQualificationForm will Auto Check Pass Radio Button After Scan On client
8.AutoCompleteLotAfterPassedInspection
LotQualificationForm check pass will set lot status Completed or QAFinished
9.AutoLoadEngineeringDataWhenCreatingTask
Auto load engineering data(NoProduceGap,Setuption,TearTime..) when create tasks
10.Cavity_Mapping_Required
Check Cavity must less than MoldCavities when create mold matrixes.
11.CHECK_OUTPUT_WHEN_SPLITE_TASK
12.CheckDeliveryQuantityOfPreviousSequenceBeforeReportQuantity
Check Current Prod Qty must less than preSequence delivery qty
13.CheckDeliveryQuantityOfPreviousSequenceBeforeStartingTask
PrevioursSequence delivery qty must be more than zero when setup tasks
14.
Check PartOps is exists or not when move the tasks on schedule.
2.ALLOW_OVER_SCRAP
It will threw exception when scrap qty > good qty
3.ALLOW_SPLIT_TASK_TO_SAME_RESOURCE
4.AUTO_SCH_CHECK_WO_DUE_DATE
Check WO Dure Date if there are multi molds(estimatedComplete must less than dueDate).
5.AUTO_SCH_HOURS_ALLOWED_TO_BE_DELAYED
Calculate operation dule date(hours)
6.AUTO_SCH_RES_WITH_SAME_PRODUCT_IN_PROCESSING_PREFERRED
Check Resource In Processing the Same Product
7.AutoChoosePassAfterScanned
LotQualificationForm will Auto Check Pass Radio Button After Scan On client
8.AutoCompleteLotAfterPassedInspection
LotQualificationForm check pass will set lot status Completed or QAFinished
9.AutoLoadEngineeringDataWhenCreatingTask
Auto load engineering data(NoProduceGap,Setuption,TearTime..) when create tasks
10.Cavity_Mapping_Required
Check Cavity must less than MoldCavities when create mold matrixes.
11.CHECK_OUTPUT_WHEN_SPLITE_TASK
12.CheckDeliveryQuantityOfPreviousSequenceBeforeReportQuantity
Check Current Prod Qty must less than preSequence delivery qty
13.CheckDeliveryQuantityOfPreviousSequenceBeforeStartingTask
PrevioursSequence delivery qty must be more than zero when setup tasks
14.