- 博客(12)
- 资源 (1)
- 收藏
- 关注
转载 [转]User Exit for Release Procedure (PR)
User Exit for Release Procedure (PR) By Willem Hoek http://www.sap123.com/a/74/ Sometimes either the logic to be used is to complicated to use normal strategies or the field to
2010-03-31 23:34:00 1732
原创 Setting for storage location
Setting for storage location 库存地点相关设置: Enterprise Structure: OX09 Maintain storage location SM30:V_T320 Assign warehouse number to plant/storage location Inventory Management: OMB2 Creat
2010-03-30 12:15:00 3904
原创 User Fields in PR/PO Release Procedure
The system carries out the following activities in order to determine the release strategy for a purchase requisition. Filling the communication structure When you process a purchase requisition, the
2010-03-15 16:33:00 2576
原创 STO一步转储不支持序列号输入
关键字:stock transport order、1 step、movement type 645、serial number 这个问题是肖肖同学提出来的:“一步转储的,用交货单方式的,怎么不能带序列号?”、“提示序列号物料不能用645移动类型”。查了网上,找到了类似问题,请参考: https://forums.sdn.sap.com/thread.jspa?threadID=1374639
2010-03-08 23:35:00 5167 1
原创 SAP Tables for WM
SAP Tables for Warehouse Management Transfer requirement LTBK - Transfer requirement - header LTBP - Transfer requirement - item Transfer order LTAK - Transfer order - header LTAP - Transfer
2010-03-08 21:57:00 2296 2
原创 物料的周期单位价格突然高得离谱
如图所示(周期单位价格从3506.21猛升为2700587.73,是原来的770倍): 经常分析发现,用户在处理原油储耗时走了一般的采购损耗流程,即数量作盘亏处理,亏损部分的金额计入了材料存货成本。从而使物料在数量减少,而总价值未变的情况下,周期单位价格升高。
2010-03-06 10:43:00 5273 2
转载 [转]MBEWH表数据更新逻辑
资料来源:http://www.saphow.com/html/82/n-82.html 无论移动平均价(Moving Average Price MAP)是否有更改,MBEWH表都会更新。 MBEWH表记录了MBEW表的历史数据,而MBEW是物料评估(Material Valuation)表。 MBEW表记录了当前的物料价格,当物料价格被重估(比如更新物料当前移动平均价)时,SAP系统会将
2010-03-05 12:01:00 9844
原创 MM配置的节点的快速入口
OLMB IMG Inventory Management OLMD Customizing For MRP-CBP OLME IMG View: Purchasing OLML IMG structure Warehouse Management OLMR IMG Invoice Verification OLMS C RM-MAT Master Data M
2010-03-05 10:48:00 1893
转载 [转]What Is Planned and Unplanned Consumption
原文地址:http://www.sap-img.com/production/what-is-planned-and-unplanned-consumption.htm Define what is planned and unplanned consumption? Unplanned consumption is updated only for materials planned us
2010-03-03 21:42:00 1211
转载 [转]SAP中物料发放的部分概念
原文地址:http://blog.sina.com.cn/s/blog_4f9d7c7a0100esbe.html 消耗(Consumption) 对生产订单、销售订单、或是成本中心发料均可称为消耗性的发料,消耗性的发料只能从非限制使用的库存中发出。但对于质量随机取样或报废,还可以从冻结库存及质检库存中发料。 如果针对物料类型定义了消耗更新,则这些消耗可以更新到物料主数据的工厂层数据中(
2010-03-03 21:37:00 2626 1
转载 [转]同一公司代码下工厂间的库存转储
同一公司代码下工厂间的库存转储 原文地址:http://blog.csdn.net/zjjmac/archive/2008/07/23/2697574.aspx 工厂间的库存移动不仅会引起库存数量的变化,如果这2个工厂不属于同一个评估范围,在库存移动的同时,会产生一张会计凭证。以下是2种不同的库存转储方案: 无转储订单(STO)的工厂间库存转储 1. 一步法: MB1B 移动类型3
2010-03-03 15:26:00 3531
SAP EWM扩展仓库管理系统解决方案
2012-03-27
空空如也
TA创建的收藏夹 TA关注的收藏夹
TA关注的人