StarUML中InteractionOperation的画法

StarUML画InteractionOperation的方法:http://stackoverflow.com/questions/16152278/using-alt-in-sequence-diagrams-for-staruml

 

I had just found the steps as following.Please refer how to set "alt combinedFragment at starUML due to I have no10 reputation to post image.

 

1.create a sequence diagram.

 

2.add a CombinedFragment1 into diagram.

 

3.change the "seq CombinedFragment1" to "alt CombinedFragment1 "

 

4.select the "InteractionOperand"

 

5.left-click at the "atlCombinedFragment1 ",you will found the one "InteractionOperand1"added into the "alt CombinedFragment1 ".

 

6.add the 2nd"InteractionOperand", same with step 4,step5, there will a partingline like the following.

 

7.set the InteractionOperand's Guarddata,my is "isInit",you will found it at the alt frame.

 

8.add the 2nd Guard data,same with thestep7.

 

9.move the diagram to the proper location.

评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值