113.You are working on a new Oracle Database 11g server, where only the software is installed and no

113.You are working on a new Oracle Database 11g server, where only the software is installed and no
database is created. You plan to create a database on this server using the Database Configuration
Assistant (DBCA).
Some of the requirements set for your database creation task are:
1: Configure the database to operate in shared server mode.
2: Disable automatic maintenance tasks such as optimizer statistics collection.
3: Configure a naming method to help the remote user connect to the database instance.
4: Use Automatic Storage Management (ASM) for storing the database files.
5: Configure daily database backup to flash recovery area.
6: Configure Enterprise Manager Database Control to manage the database.
Which of these requirements can be met while creating the database?
A.4 and 6
B.2, 3, 4, and 6
C.1, 2, 4, 5, and 6
D.1, 2, 3, 4, 5, and 6
答案:C

第1步--这个是10g的,我在11g上没有找到


第2部--这个也是10g的,11g上没找到


第3步是tnsname的事

第4步


第5步


第6步


  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值