成本计算 Error Code: CST_INVALID_WIP

成本计算 Error Code: CST_INVALID_WIP

The issue can be reproduced at will with the following steps:

1. Oracle cost Management

2. Inventory Material Transactions

3. Review material txn

 

select distinct mmt.transaction_source_id,mmt.error_code

from    mtl_material_transactions  mmt

where  mmt.costed_flag ='E'

 

错误代码:CST_INVALID_WIP   

中文错误解释:WIP 实体未定义或不具有期间余额项

英文错误解释:The wip entity is either not defined or does not have a period balance entry

 

 

 

 

 

SOLUTION: FYI

 

1) Run the datafix scripts to:

  a. To change null date released = minimum transaction date.

  b. Change date released =  minimum transaction date.

  c. Create missing wip_period_balances record after changing release date.

 

2) Check that for all the jobs, date released is populated.

3) After step 2, process pending transactions in wip_cost_txn_interface. 

Record in mtl_material_transaction table will not be costed if record is 

stuck in wip_cost_txn_interface.

4) Resubmit the transactions for costing.

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值