WIP Component Pick Release是WIP模块的挑库(Picking Release),这个和订单模块的挑库类似,但又有区别。

相同点:不管是WIP还是OM的挑库,他们都会用到挑库规则

区别:订单模块的挑库,是把仓库中的货物挑选出来,然后发往一个临时发货区(Staging Subinventory);

WIP的挑库,目的地取决于WIP Supply Type

1.1. 对于Push类型的工单,如果不指定Supply仓库的话(Supply Subinv为非必填项),WIP Component Pick Release之后并Transact Move Order,那么物料将直接到工单上,相当于做了WIP Component Issue,这种Move Order的Transaction_Type_ID为35。

(参见:Oracle EBS R12 WIP Component Issue&Return Process中例子)

Component Pick Release之后,会生成一个Move Order

可以看到Move Order的事务类型为WIP Issue(Transaction_Type_ID:35)


1.2. 对于Push类型的工单,如果指定Supply Subinv的话(这个Supply Sub有点类似于订单挑库时的临时发货区),WIP Component Pick Release之后并Transact Move Order,那么物料将直接到工单上,相当于做了WIP Component Issue,这种Move Order的Transaction_Type_ID为35。你可以WIP > Job/Shedule Details > Material Requirements里修改Supply Subinv,特别需要注意的是:Supply Subinv必须是不可保留的(Non Reservable),否则在Component Pick Release报这样的错:

Error in component pick release.

Job/schedule number (JOB_NAME) has a reservable supply subinventory (SUPPLY_SUB_NAME) for component (COMPONENT_NAME)

上图中,因为Supply Sub:RIP允许保留,所以报错.我们可以定义一个不可保留的子库,Supply_Sub,并且不允许保留(是否允许保留由Material Status来控制)

然后设置这个新定义的子库到Supply Sub

然后Component Pick Release,可以看到Move Order对应Transaction Type变为了Backflush Transfer(TRANSACTION_TYPE_ID:51),Backflush Transfer实际上类似于Subinventory Transfer,只不过这里的目标Sub必须是non-reservable。

View/Update Allocation

接下来,你去WIP Material Transaction里做WIP Issue,给工单供货,默认给工单供货的子库就是刚才的目标子库“Supply_Sub”(当然这里你也可以改成其他的子库)



2.1 对于Pull(Operation Pull, Assembly Pull)类型的工单。WIP Component Pick Release会把物料从Source Sub(Reservable) 以Backflush Transfer的形式转移到这个Supply Sub。工序完工(To Move)或者工单完工(WIP Completion)的时候,以backflush的方式从Supply Sub扣料。

如果BOM中没有指定Pull物料的Supply的Subinventory和locator,那么Job在Release之后,Job会把Work in Process Parameters中的默认Supply Subinventory和Locator作为Supply Sub/Locator。


Source Subinv and Supply Subinv

WIP Component Pick Release会把物料从Source Subinv转移(backflush transfer)到Supply Subinv。需要注意的是,Source Sub必须是可保留的;而Supply Subinv是不可保留的。原因是什么呢?

1. The source sub inventory  (the sub inventory which stores the on-hand, or the sub inventory  from which the components are to be picked) should be reservable.
2. The supply sub inventory  (the staging sub inventory or the sub inventory which receives the components from the source sub inventory through the move order) should NOT be reservable.
This is the current functionality (R12). Component pick release will allocate the material only from reservable subinventories. The reason for this being that if it were to pick material from non-reservable subinventories, then it could pick material already picked for another job, since picked material resides in supply subinventories which are not reservable.

WIP component Manufacturing move order lines are auto detailed, when running WIP component pick release. If the detailing process is unable to allocate the lines, then the lines will get backordered and closed. Hence, if the pick from subinventory is not reservable, all the move orders lines will get closed and the components will not get allocated.


Reference:http://www.oracleug.com/user-guide/work-process/component-pick-release


转载请注明出处:http://blog.csdn.net/pan_tian/article/details/8942447

0
0
查看评论
发表评论
* 以上用户言论只代表其个人观点,不代表CSDN网站的观点或立场

使用API进行销售订单的Pick Release和Pick Confirm

DECLARE x_return_status VARCHAR2(2); x_msg_count NUMBER; x_msg_data V...
  • chosen1brain
  • chosen1brain
  • 2015-06-18 14:42
  • 1373

WIP 移动事务处理API Demo

DECLARE l_rec_move_txn wip_move_txn_interface%ROWTYPE; l_group_id NUMBER; l_txn_id N...
  • chosen1brain
  • chosen1brain
  • 2014-08-08 10:49
  • 1143

WIP完工入库及完工退回的几个重要问题

1.必须向CST_COMP_SNAP_INTERFACE表中插入此工单所有工序的数据(也就是说同样的工单插入多条,只是工序号不一样) 标准文档: Note: If there are multiple...
  • caixingyun
  • caixingyun
  • 2014-07-28 22:40
  • 2658

Oracle EBS R12 WIP Component Issue&Return Process

1.定义BOM BOM(物料清单)是WIP的基础,BOM定义了产品的组成结构图,定义了生产特定物料所需的零件及数量。每一个零件也可能有他们的BOM结构,由此产生多层的产品结构树。 比如:一台电脑 ...
  • pan_tian
  • pan_tian
  • 2012-07-17 14:59
  • 9534

Nodelib WIP[12.16]

11.27 绘制出最初的框架,包含阴影,当时相当激动。像Houdini一样使用空格移动视图。 进一步细化,对不同的输入数量、辅助连接数量能够按照自己的设计绘制出对应结构。 去...
  • cuckon
  • cuckon
  • 2011-11-29 10:14
  • 1096

(WIP)SSD上的I/O电梯算法与HugePage设置可能导致的Crash(by quqi99)

作者:张华  发表于:2016-03-24版权声明:可以任意转载,转载时请务必以超链接形式标明文章原始出处和作者信息及本版权声明( http://blog.csdn.net/quqi99 )问题虚机里...
  • quqi99
  • quqi99
  • 2016-03-24 20:30
  • 1931

某处看到的SO与WIP的关系(仅限于从标准SO自动产生任务单)

/* Formatted on 2014-9-22 17:30:45 (QP5 v5.115.810.9015) */ SELECT WIP_SO.SALE_ORDER_NUMBER SO_NUM ...
  • mia502908009
  • mia502908009
  • 2014-09-22 17:35
  • 424

燕过留声:由 Activity 和 Fragment 的通信方法想到的【WIP】

今天查看 Fragment 的官方文档,发现2点值得细究的地方: Fragment 和 DetailActivity 均被定义为 static,而非定义在单独 .java 文件中; Activity...
  • zhaizu
  • zhaizu
  • 2015-10-31 23:41
  • 1398

cherry-pick C++ 清华大学算法与算法复杂性理论第一次上机实验

  • 2017-04-11 18:11
  • 630B
  • 下载

Pick_zoom.zip

  • 2012-03-01 16:47
  • 3.94MB
  • 下载
    个人资料
    • 访问:4708852次
    • 积分:50791
    • 等级:
    • 排名:第68名
    • 原创:907篇
    • 转载:54篇
    • 译文:5篇
    • 评论:347条