BW--Daily BW Systems Checklist

 
This list of transactions is designed to guide a Basis Admin team member through the process of keeping tabs on major systems issues and root cause issues and trends for each system in the landscape.
 
This will only identify and help triage issues to Helpdesk, Infrastructure, OS team or DBA team, Basis or functional developers or whomever…but guarantees that each system in a landscape gets a regular, weekly look. The goal is to eliminate root causes of repeating issues.
 
Step One: Identify what is going on right now
Why? This info may skew other readings
SM51 – SM50 (or SM66 and SMGW) – what’s running and active now
SMICM – what’s going on in the web server…and max/peak usage
AL08 – who’s on and inactive…what are they doing?
 
Step Two: Analyze what happened overnight
Why? ID any major new issues or daily trends for loads
ST22 – short dumps indicate major issues
SM21 (change time filter to include since you last looked) for each app server – shift in SM51
SM37 – active or cancelled jobs
RSMO – overview of process chains/InfoPackages (also RSA1-monitoring-monitor)
RSPC – log view of trouble chains
STMS – import history
 
Step Three: Check weekly trends (once per week per system is ok)
ST02 – look at buffers – red? Quality lower than 90%? >20,000 swaps?
ST04 – database buffer quality – in detail analysis, lockwait, latchwait, db message log
ST06 – CPU usage, now and detail-CPU snap and CPU previous hrs, OS Log
DB02 – disk space and weekly growth...and that disk storage availability is ahead of needs
 
Step Four: Major troubleshooting transactions if deeper analysis required
SE03 – STMS – SE09/SE10 TMS info – observe import history patterns
SLG1 – Application Logs
RSD1 – Repair InfoObjects
RSRV – Analysis and repair of BW Objects – Master data to Transactional Data ratio
ST03N – Query and Load performance analysis – BW Expert mode
RSRCACHE – Web query cache (parameters RSCUSTV14)
RSRT/RSRT2 – query analysis – which area is that problem happening in?
AL11 /work process/RFC logs
BW Stats Queries (0TCT) – examine for trends out of the ordinary/expected
WE20/WE21/SM59 – system connections or SE16 tables related to these
SE38 Reports:
SAP_INFOCUBE_INDEXES_REPAIR
RSPARAM
RSCR_CHECK_INSTALLATION_PARAMS (Crystal Enterprise)
RSPOR_SETUP (portal configuration)
RSAR_RSISOSMAP_REPAIR
BW_IGS_ADMIN or BW_IGS_CHART_TEST (IGS)
SRMO or RSODADMIN (TREX)
SPAD – printing issues 
  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
华为-原理图绘制评审规范-checklist是华为公司为了确保原理图绘制质量和准确性而制定的指南。以下是一份可能的评审规范-checklist: 1. 原理图符号准确性:检查原理图中的各个元件符号是否正确,包括器件、连接线、电源等。确保符号与实际元件相对应,并且没有错误或遗漏。 2. 连接线规范:检查连接线的走向是否符合设计要求,并且没有交叉、断开或不必要的交叉。确保连接线的长度合适且整齐,以提高信号传输的质量。 3. 电源规划:检查电源的布局和规划是否符合设计要求,包括电源线的位置和连接方式。确保每个器件都能得到足够的电源供应,以避免电源噪声或干扰。 4. 阻抗匹配:检查原理图中的阻抗匹配电路是否正确,并且与设计规格相符。确保各个信号路径的阻抗匹配良好,以提高信号传输的稳定性和可靠性。 5. 信号完整性:检查原理图中的信号传输路径是否正确,并且没有信号路径交叉、误接或不必要的延迟。确保信号的传输路径短、直接,并且能够保持信号的完整性和稳定性。 6. 地线和功率线分离:检查原理图中的地线和功率线是否分离,并且没有交叉或干扰。确保地线和功率线的分离可以减少干扰和噪声,提高系统的稳定性和性能。 总之,华为-原理图绘制评审规范-checklist旨在确保原理图的准确性、规范性和可靠性,以提高华为产品的质量和性能。通过逐项检查每个要素,可以及时发现和纠正潜在的问题,确保原理图符合设计规格,并满足客户的需求。

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值