Ignition Operation Issues of the Rotary Kiln

 It is known that the rotary kiln refers to rotating calcining kiln (commonly known Xuanyao), belongs to the class of building materials equipment.  according to different materials, Rotary kiln can be divided into cement kiln, metallurgy chemical kiln and lime kiln. The cement kiln is mainly used for calcining cement clinker  in cement kilns , which can be divided into dry and wet process cement kiln these two categories, Metallurgy chemical kiln is mainly used in metallurgical industry, steel plants depleted iron ore magnetic roasting; oxidizing roasting of chrome, nickel, iron; the Refractory Plant roasting high alumina of vanadium bauxite and aluminum roasting clinker, aluminum hydroxide; chemical plant baking chrome ore and chromium ore and other minerals. Lime kiln for roasting (ie, active lime kiln) steel plant, ferroalloy plant with active lime and light burned dolomite.

Ignition is the first step of the fired rotary kiln system production ,whether in the operation of the new production line , or the maintenance of machinery in production process, lining replacement or trouble parking, the ignition operation are all required to carry out, that is the initial coal injection combustion.

The following briefly describes the rotary kiln ignition notation:
[1] First start the kiln inlet main exhaust machine, adjust the air intake valve, pull the kiln and piping system wind about 5 minutes, reduce the concentration of carbon monoxide in the kiln system,makes it full of fresh air, while close the kiln inlet access doors .
[2] before rotary kiln ignition  spraying, we need to adjust the pulverized coal burner position and status , the distance between the general coal injection nozzle and the kiln mouth is about 0.5 m, we also need to adjust the coal burner channel interface to the relatively larger, make the starting flame early soft and smooth , the fire was concentrated,so the pulverized coal easily ignited.
[3] before the ignition, we should be sure to open the appropriate degree of the preheater ignition breathing apparatus. It is best to get the central control for the convenience of adjusting .but due to the preheater temperature is high, kiln pumping force is large,which is adverse to the early coal combustion , so we need to control the kiln wind speed by depressing breathing apparatus.
[4] spray pulverized coal before the on-site testing, this is mainly to ensure the smooth flow of pulverized coal injection piping system, the pulverized coal scales Gongmei control is reliable. The test spray time should not be too long, about 2 minutes, but we should contact with the  on-site staff  timely, stopping spraying immediately after confirming the coal powder.

Mobile jaw crushers : http://www.ore-machine.com/jaw-crusher.html
Ore beneficiation : http://www.hxjqcrusher.com/crusher/Ore-beneficiation.html
 

Impact crushing machine : http://www.hxjq-crushers.com/impact-crusher.html
Dryer machine : http://www.crusher-export.com/dryer.htm

转载于:https://www.cnblogs.com/dvbcxb/archive/2012/09/10/2678679.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值