Operation Precautions of Jaw Crusher

Jaw crusher should be installed above the concrete foundation,and plus  skids or rubber to reduce vibration when working. 

Jaw crusher's (jaw crusher) operation: the correct operation of the crusher  is one of the important factors that guarantee the crusher works properly, improper operation or negligence in the operation are often caused equipment and personal accidents. Correct operation is to  follow the rules strictly.

The preparatory work Before starting : careful examination before starting the crusher, the check contents are: crusher tooth plate wear situation, adjust ore discharging mouth size, whether the ore crushing cavity having ore; if large block ores exist, we must remove them,; whether the connection screws loose; whether the pulley  Flywheel protection cover is intact; whether the tightness of the triangle belt and trolley spring are suitable ;whether the lubrication system is intact; whether the electrical equipment and signal system are normal or not.
 
Handling Precautions of jaw crusher (jaw crusher):
1, After starting, if the crusher makes unusual beat, we should stop automatically turn, and restart after identifying and eliminating the ills .
2. When starting, Crusher must no-load , when the automatically turn is normal, we can start the ore-discharging equipment , the ore be fed into should be gradually increased until the load is full.
3. Ore discharging Should be uniform , ores are not allowed to be packed with the crushing chamber; the  maximum  mine size allowed should not be larger than 0.85 times of the ore discharging mouth size; while feeding ore, we should ban the anti-mine iron and other non-HSBC crushed materials into the crusher; once we found these non-broken materials go through the port of discharge, we should immediately notify the belt transporter in time to prevent serious equipment accidents of the next crusher , such as the impact crusher and hammer crusher.

In the operation process, we often have to pay attention to the situation of lump ores stuck to the mine mouth, sometimes use an iron hook flip or application-specific tools when operating, but not by hand to avoid an accident. During operation ,if the ore feeding are too many to choke the crushing chamber, do not stop the crusher ,but should stop ore-feeding, we should start the ore feeding machine after dealing with the ores in the crushing cavity. during working, the operator should conduct check regularly, according to to see, hear, touch and other methods to observe the various components situations of the crusher position and bearing temperature, the bearing temperature must not exceed 60 ° C, we should not immediately stop when the bearing temperature is too high, instead,we should take plus large amount of oil, forced ventilation, water-cooled these methods to reduce the temperature.
 

转载于:https://www.cnblogs.com/dvbcxb/archive/2012/08/31/2665752.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值