• 博客(0)
  • 资源 (4)

空空如也

In-plan操作手册

1. Login Server & Open InPlan 2. InPlan base menu instruction 3. Create new job or Open Job 4. Run Order download 5. Run Odbsync 6. Create order spec. 7. Review & edit Job Details 8. Run set job by spec. 9. Do & modify Stack-up 10. Run Process tree & Save 11. Add additional tools using control.bat 12. Review & update Matrix 13. Run MRP naming 14. Edit drills 15. Edit Order Spec 16. Run traveler 17. Compare Spec. 18. Update BOM 19. Check in Job & release to Oracle 20. Undo check out All 21. Set Job on hold & resolve all on holds of job 22. Appendix

2014-08-16

InPlan-Architecture-1.7-Rules

20_InPlan-Architecture-1.7-Rules

2014-08-16

TM2007 B1 SP1 dtone

TM2007 B1 SP1 dtone

2014-08-16

VNC-Viewer-5.0.3-Windows-32bit

VNC-Viewer-5.0.3-Windows-32bit

2014-08-16

空空如也

TA创建的收藏夹 TA关注的收藏夹

TA关注的人

提示
确定要删除当前文章?
取消 删除