EBS Po_Requisition_Lines_All.REQS_IN_POOL_FLAG字段说明

最近遇到Po_Requisition_Lines_All.REQS_IN_POOL_FLAG被修改为空的情况,实际上这个pr还没有被转成po,在metalink上查了一下这个字段的说明

P=PR已经被审批并且转为了PO,有对应的PO订单;

Y=可以转换为PO,但是还未转换成PO;

N=行被取消;

以下为metalink原文 Doc ID 2481786.1

This field is a flag to indicate if the requisitions are available for purchase order creation :

  • P = It is approved and there is a purchase order
  • Y = It is in the Pool to be converted into a PO (Is available in the Document Builder)
  • N = It is not in the Pool to be converted into a PO (ie: Line is Canceled)

The POR_REQUISITION_LINES stores information about requisition lines. The user needs one row for each requisition line you create.

Each row contains the line number, item number, item category, item description, need-by date, deliver-to location, item quantities, units, prices, requestor, notes, and suggested supplier information for the requisition line.

PARENT_REQ_LINE_ID contains the REQUISITION_LINE_ID from the original requisition line if user has exploded or multisourced this requisition line.

POR_REQUISITION_LINES is one of three tables storing requisition information. This table corresponds to the Lines region of the Requisitions window.

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值