218.220 Measurement 1Python

Java Python 218.220

Measurement 1

[Individual Assessment]

DUE DATE: 20th September 2024 at 5 pm (17:00)

Assessment description – LO’s 1, 2 & 3

Percentage Weighting – 40%

Submission and Marking:

· This assessment will be completed in two mediums, which means you will get your marks at two different stages.  You will complete your measurements and Bill of Quantities workbook in CostX and then copy some of the answers into Stream.

a. You will submit some answers via a Stream quiz.

b. The BoQ workbook will be submitted via the dropbox link provided. Ensure you save your work as Portfolio 1 – Student ID number

· To assist you answer the Stream quiz, the questions have been duplicated in this brief.  You can fill in your answers in the space allocated as you progress through the brief.  Remember though, it must reflect what is in YOUR CostX measurements, as this will be reviewed when I mark your BoQ workbook.

· Please review the marking rubric for the allocation of marks.

· All questions associated with this assessment MUST be posted to: Portfolio 1 Q&A. I will not accept any questions via “Private communication with the lecturer”.  Questions associated with how to complete the assignment are not of a private nature.  Ensure that before you post your question, you have reviewed the previous posts – it may have already been addressed.

· If you need an extension, please contact Ravindu, NOT Lara.

· Submit your file before the deadline. Do not leave it till the last moment – computer issues are not accepted as an excuse.

Assignment Brief

· Download the CostX drawings provided on Stream under the Assessment tab:

Portfolio One

· Create a New Building

Name: Portfolio 1 - Your Student ID Number (e.g., Portfolio 1 – 1234567)

Project: Default Project

· Add the drawings and folders. You may need to change the file names. Your folder layout should look like the image below (make sure the folder and files names are correct and the files are in the correct folder). Do NOT use the same drawing names as mine. Yours must be meaningful. Imagine if you were working on a real job and had over 50 pages of plans, sections and elevations.

· Check the calibration or scale on all the drawings. Ensure all pages are set landscape, not portrait.

· All measurements are to be taken in accordance with ANZSMM.

· Ensure your Dimensions Groups is set to two decimal places.

PART 1 – STREAM QUIZ

SAMPLE ANSWER

The information highlighted in yellow is what you would insert into the Stream quiz.  Be careful of your spelling.  If you spell it incorrectly, you will lose marks.

Description/Question

Answer

Instruction

Trade

4

Please complete (No)

Category

4.2

Please complete (No or n/a)

Classification

surface preparation

Please complete (text)

Sub-classification

clearing the site

Please complete (text or n/a)

Unit of Measurement (UoM)

m2

As per ANZSMM - m, m2, m3, no, item

Quantity (Taking off sheet)

97.86

as per best practice principles

i.e. 10.00 (if m, m2, m3)

10 (if no or item)

MEASUREMENTS

Where did this information come from?

Using the most current version of ANZSMM you will find the information in the following headings and columns. If there is no information in the Category or Sub-classification, you simply use n/a.

Using: SITE PLANS | HIGHBROOK Dr

Measure the overall area of the tarmac around the building on the corner of Highbrook Dr and Underwood Dr. The image is an indication of the space to be measured.

Remember, the more points you use, the more accurate your measurement – but be realistic!

When you prepare your Bill of Quantities, you are required to describe this item under Groundworks. It would be an item that would occur at the earliest stages in preparation for the remainder of the work.

QUESTION 1    [7 MARKS]

Description/Question

Answer

Instruction

1.1

Trade

4

1.2

Category

Please complete (No or n/a)

1.3

Classification

Please complete (text)

1.4

Sub-classification

Please complete (text or n/a)

1.5

Unit of Measurement (UoM)

1.6

Quantity (Taking off sheet)

What is the perimeter of the large open field?  [Highbrook Dr, El Kobar Dr, Sir Woolf Fisher Dr and Underwood Dr?]

QUESTION 2    [4 MARKS]

Description/Question

Answer

Unit of Measurement (UoM)

Quantity (Taking off sheet)

Using SITE PLANS | Autodesk University

What is the total area of the existing building?  Hint – it includes four zones, but not the red bits that stick out.

In the BoQ you are required to measure this as the plastic damp proof membrane.

QUESTION 3   [8 MARKS]

Description/Question

Answer

Instruction

Trade

Please complete (No)

Category

Please complete (No or n/a)

Classification

Please complete (text)

Sub-classification

Please complete (text or n/a)

Unit of Measurement (UoM)

Quantity (Taking off sheet)

Using LAWRY STREET

You need to import the following drawings L03, L04, L10, L11, L12, L15.  You may also need some other pages for information purposes, but you do not need to import them into CostX.

Give each sheet an appropriate name, but NOT the layout number provided below.

Layout L03 & L04

Measure all 900 internal single swing doors.  Set positive dimension to orange.

QUESTION 4   [8 MARKS]

Description/Question

Answer

Instruction

Trade

Please complete (No)

Category

Please complete (No or n/a)

Classification

Please complete (text)

Sub-classification

Please complete (text or n/a)

Unit of Measurement (UoM)

Quantity (Taking off sheet)

Layout L03 & L04

Measure floor finish (only) Type 15.  Set positive dimension to slate.  Measure under all fittings, baths, WC’s and other installations.  Use the Finishes schedule provided (S02) for further information.  You do not need to add this to CostX.

QUESTION 5     [8 MARKS]

Description/Question

Answer

Instruction

Trade

Please complete (No)

Category

Please complete (No or n/a)

Classification

Please complete (text)

Sub-classification

Please complete (text or n/a)

Unit of Measurement (UoM)

Quantity (Taking off sheet)

Measure floor finish (only) Type 16.  Set positive dimension to slate.  Measure under all fittings, baths, WC’s and other installations.  Use the Finishes schedule provided (S02) for further information.  You do not need to add this to CostX.

QUESTION 6     [8 MARKS]

Description/Question

Answer

Instruction

Trade

Please complete (No)

Category

Please complete (No or n/a)

Classification

Please complete (text)

Sub-classification

Please complete (text or n/a)

Unit of Measurement (UoM)

Quantity (Taking off sheet)

Measure floor finish (only) Type 17.  Set positive dimension to slate.  Measure under all fittings, baths, WC’s and other installations.  Use the Finishes schedule provided (S02) for further information.  You do not need to add this to CostX.

QUESTION 7     [8 MARKS]

Description/Question

Answer

Instruction

Trade

Please complete (No)

Category

Please complete (No or n/a)

Classification

Please complete (text)

Sub-classification

Please complete (text or n/a)

Unit of Measurement (UoM)

Quantity (Taking off sheet)

Layout L11

QUESTION 8     [8 MARKS]

Description/Question

Answer

Instruction

Trade

Please complete (No)

Category

Please complete (No or n/a)

Classification

Please complete (text)

Sub-classification

Please complete (text or n/a)

Unit of Measurement (UoM)

Quantity (Taking off sheet)

How much weatherboard do you require for the maximum height N Elevation section once you deduct the windows and doors?

Layout L12

Measure the volume of the brickwork in the two entry columns.

QUESTION 9     [4 MARKS]

Description/Question

Answer

Unit of Measurement (UoM)

Quantity (Taking off sheet)

End of measurement section

PART 2

BILL OF QUANTITIES

You are required to convert some of your measurements (those with Trade numbers) into a Bill of Quantities for your Client.

· You are required to use the Live Linking method to undertake this task.

· Your Bill of Quantities must have a cover page (Level 1) and a trade summary page (Level 2) before you get to the detail of each category and measurement (Level 3).

· Ensure that each trade has relevant preambles associated with it. See Stream for more information.

· Edit your descriptions (if necessary) to a BoQ standard.

· Once you are ready to submit your workbook (BoQ), export your file as EXF and upload it to Stream         

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值