1.Periodic maintenance procedures under maintenance, maintenance operations, such as cleaning, lubrication, fuel, etc.
2.Check each controller good or not before turn on concrete mixer.After used, put water and stone into the drum for cleaning about 10-15 minutes.Then cleaning water and stone out.If operator need enter into the drum for cleaning, should cut down switch and remove the fuse box, then lock the switch box.
3.Removed the accumulation in the concrete mixer drum with sledgehammer beating the method is prohibited, only can be removed with a chisel.
4.In winter, cleaning concrete mixer drum by water, then clean the water of pump, water tanks and water pipes water out of the drum.
Operating procedures
1.Before use mixer should test under empty commissioning.
2.Adjust time according mixing time relay timing adjustment, note to adjust in the case of power outages.
3.Moistened with water mix drum, blade and word place.
4.In the work process, if electrical or mechanical failure should discharge part of mixing materials, after reduced load and removed troubleshooting can operate mixer.
5.When operating concrete mixer, always need check it to prevent security incidents such as electric shock and mechanical wounding.
6.Finished checked, turn off the power, clean the mixing drum and venue, and cleanup.
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows: diesel concrete pump, commercial concrete batching plant, concrete batching plants,concrete mixer,blocking making machine,concrete pump,loader,dumper,etc.来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/28610507/viewspace-762880/,如需转载,请注明出处,否则将追究法律责任。