(71)The Automatic Database Diagnostic Monitor(ADDM)analysis runs every 60 minutes on your database.
Your database is facing a series of interrelated problems over a period of two hours.
You need to ensure that the ADDM analysis is run over a time span of two hours in future.What would you do?
A. Create two custom ADDM tasks.
B. Modify the AWR snapshot time interval to two hours.
C. Create a new scheduler window for a time period of two hours.
D. Modify the Automatic Workload Repository(AWR)snapshot retention period to two hours.
答案:(B)
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/17013648/viewspace-1252212/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/17013648/viewspace-1252212/