Mining industry of machinery and equipment in use after a period of time, will appear all sorts of problems, and is often contact big rocks and broken equipment, spare parts wear is very serious, of course, this is very normal things, because of the broken material need for the wear-resisting durable equipment, so for the problems to be found in time, the equipment repair and replacement parts, to ensure safe and effective production machine.
In the midst of all the problems, however, the most frequently encountered problem is the material out of sync problem, that is the problem of the large amount of powder on the stone crushing production line, in fact we can't blind to solve this problem, should according to different actual situation, make corresponding adjustment, we all know that reaction type crushing equipment is mainly used in the engine room the rotation of the rotor, driven in hammer head against collision stone eventually make it broken, stone under the effect of the rotor collide with each other, forming a large stone, increase the material between the collide each other.In this process, the rotor spun, blast volume is bigger, small stone will overflow, cause dust pollution.
In fact when the pf impact crusher work, in addition to a large number of rotor with airflow, making stone powder flying, there it is mainly through the broken material in the crushing cavity through a multi-stage crushing grinding to complete, the material is crushed fine smaller degree, in the course of operation, the powder is easy to fly. In addition, it works mainly through broken beat completed, will increase the amount of dust, as well as the back plate collision will be worn long or, worse, falling back plate surface conditions occur, this will cause Crusher sealing machine greatly decreased, increased dust pollution. To solve the crusher work powder volume, the user, when used, can be additionally equipped with a dust removal device, or external enclosure, you can also play in the material before the material enters the crusher feed opening plus a small amount of water wet dust humidifier or directly coupled with the work.
In the midst of all the problems, however, the most frequently encountered problem is the material out of sync problem, that is the problem of the large amount of powder on the stone crushing production line, in fact we can't blind to solve this problem, should according to different actual situation, make corresponding adjustment, we all know that reaction type crushing equipment is mainly used in the engine room the rotation of the rotor, driven in hammer head against collision stone eventually make it broken, stone under the effect of the rotor collide with each other, forming a large stone, increase the material between the collide each other.In this process, the rotor spun, blast volume is bigger, small stone will overflow, cause dust pollution.
In fact when the pf impact crusher work, in addition to a large number of rotor with airflow, making stone powder flying, there it is mainly through the broken material in the crushing cavity through a multi-stage crushing grinding to complete, the material is crushed fine smaller degree, in the course of operation, the powder is easy to fly. In addition, it works mainly through broken beat completed, will increase the amount of dust, as well as the back plate collision will be worn long or, worse, falling back plate surface conditions occur, this will cause Crusher sealing machine greatly decreased, increased dust pollution. To solve the crusher work powder volume, the user, when used, can be additionally equipped with a dust removal device, or external enclosure, you can also play in the material before the material enters the crusher feed opening plus a small amount of water wet dust humidifier or directly coupled with the work.
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/29408747/viewspace-1070280/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/29408747/viewspace-1070280/