MRP-Areas are needed only if a material in the same plant need more than one type of planning parameters, or need more than one type of ATP logic (viz. SLoc specific). Having logical MRP-Areas based on material type, or based on any un-necessary requirement, should be avoided, because Plant cannot create demand on MRP-Area and one MRP-Area also cannot create demand on another MRP-Area.
Demand can be transferred from plant to MRP area via Special procurement type 45[@more@]
Demand can be transferred from plant to MRP area via Special procurement type 45[@more@]
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/744907/viewspace-912567/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/744907/viewspace-912567/