自定义博客皮肤VIP专享

*博客头图:

格式为PNG、JPG,宽度*高度大于1920*100像素,不超过2MB,主视觉建议放在右侧,请参照线上博客头图

请上传大于1920*100像素的图片!

博客底图:

图片格式为PNG、JPG,不超过1MB,可上下左右平铺至整个背景

栏目图:

图片格式为PNG、JPG,图片宽度*高度为300*38像素,不超过0.5MB

主标题颜色:

RGB颜色,例如:#AFAFAF

Hover:

RGB颜色,例如:#AFAFAF

副标题颜色:

RGB颜色,例如:#AFAFAF

自定义博客皮肤

-+

认真你就输了

常恨日光短,熬夜长知识

  • 博客(1)
  • 资源 (9)
  • 收藏
  • 关注

原创 基于Streaming I/O的V4L2设备使用

基于V4L2的应用,通常面临着大块数据的读取与拷贝等问题。尤其在嵌入式系统中,对于实时性能要求较高的应用,拷贝会花上几十个ms的时间,这通常轻则造成用户体验差,重则导致产品质量不达标。V4L2 Framework定义了几种不同的方式,用于从设备中读取数据,这篇文章简要介绍下在Streaming I/O模式下,如何使用这几种数据的获取与使用方法。Streaming I/O设计的目的就是为了减少在数据处

2017-04-12 11:32:47 4600

安全分析模型 HEAVENS

安全分析模型 HEAVENS。 This deliverable (D2 Security models, Release 2, Version 2.0) presents the results and achievements of work package WP2 (Security models) of the HEAVENS project.

2020-09-22

ISO SAE 21434.DIS 2020.02.12.pdf

ISO 21434扫描OCR文字版。 This document specifies requirements for cybersecurity risk management regarding engineering for concept, development, production, operation, maintenance, and decommissioning for road vehicle electrical and electronic (E/E) systems, including their components and interfaces.

2020-09-22

GSN_Standard.pdf

This Standard has two intended functions. Firstly, it seeks to provide a comprehensive, authoritative definition of the Goal Structuring Notation (GSN). Secondly, it aims to provide clear guidance on current best practice in the use of the notation for those concerned with the development and evaluation of engineering arguments – argument owners, readers, authors and approvers. The Standard was developed by means of a consensus process involving GSN users from both academia and industry, between 2007 and 2011. The document history on page iii outlines the recent history of the collaboration, and a list of contributors to the Standard is provided on page iv.

2020-07-15

systemd source code

Systemd source code 2012年4月,udev被合并至systemd。

2015-02-02

Rolling Wave Project Planning

Rolling Wave Project Planning (RWPP) is a phased iterative approach to project development, applicable to new product development, information systems and other technical development environments. It is an excellent formal project development approach for inventive work. When done well, it balances structured process with flexibility. It is appropriate for project life cycle models/methods that allow incremental development (spiral, evolutionary prototyping, etc.).

2012-07-17

Practice Standard for Work Breakdown Structure_SecondEdition

Practice Standard for Work Breakdown Structure_SecondEdition

2012-06-21

PMBOK2008CN+EN

PMBOK中英文版,供有需求的同行们下载

2012-06-21

空空如也

TA创建的收藏夹 TA关注的收藏夹

TA关注的人

提示
确定要删除当前文章?
取消 删除