vertical roller mill and ball mill grinding Compared

1. mill and vertical mill grinding process is different.

In the mill, the material primarily crushed by the impact and friction; and the material in the vertical grinding mill is based on the main squeeze, grinding supplemented; In contrast, the material in vertical grinding mill to stay time is short, about 2 to 3 minutes to complete, so the high grinding efficiency, saving the grinding process of power consumption (typically vertical ball mill than saving 30% -40%), and the residence time in the mill shorter, slag powder, pulverized cement activity like the impact as small, retention was better.

vertical-roller-mill-1%20(2).jpg

2. ball mill, although gradually replaced advantages, but its own requirements are higher.

Generally, when the cement raw material or pulverized into the ground water is high, basically in more than 6%, the vertical roller mill machine on high demand in this area, and it comes with drying system that requires moisture content must be in the 5% below, so before grinding process, you must first dry material drying, drying capacity stronger. However, cement grinding material into the mill itself is no water, very dry, so there is no big drying capacity affected.

Raw material grinding fineness demanding, only need to control more than 12% 0.08mm sieve can be, for easy burning and good for pre-kiln raw material, its ball mill for sale fineness can even relax the requirements to 15% 20%, and the particle size distribution of the basic requirements have not; but people on the cement product fineness and particle size distribution of high demand, cement fineness general requirements Blaine specific surface area 320m ^ 2 / kg or more.

3. Comparison of vertical mill product quality cement and cement milling

In terms of product quality, production of cement mill, consisting of a wide range of particle size, namely excessive grinding particles more, is not sufficient ground coarse particles are also a lot shorter than the normal distribution curve wide, particle morphology tends spherical; the material stays in the mill stand a short time, so the vertical mill cement particles range is narrow, the overall bias fine particles, and therefore stand at the early

use of cement mill, water demand ones, compared with normal map narrow high.

World Bonny Terminal mill finished materials for demanding, high drying capacity, the use of auxiliary heat can dry 20% of the raw water, especially for large-scale production mill production line.

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/30047666/viewspace-1365522/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/30047666/viewspace-1365522/

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值