How does the system determine the quantity structure for the cost estimate (CK11N)?

Answer: The following priority sequence applies to the determination of the quantity structure.
Priority 1:If you assign a quantity structure on the initial screen of the cost estimate, the system uses it in any case.

Priority 2:The system determines the quantity structure data that you have entered in the cost estimate view of the material.

Priority 3:Via the selection method indicator in Materials Planning view 4 in the material master, you can control whether the quantity structure occurs according to validity (lot size, period) or according to production version.

Priority 4:The quantity structure is determined via the settings in the quantity structure control (Transaction OKK5).

[@more@]

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/46681/viewspace-1057120/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/46681/viewspace-1057120/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值