You are using a function that calculates the target costs in the current
standard cost estimate for the material. Using this information, the
system can calculate the following data:
o Work in process (WIP) for the confirmed WIP quantities
o Scrap for the confirmed scrap quantities
o Variances between the target costs and the control costs
However, the cost estimate for material MXMC-001 in plant 6000 is:
o Missing
o Not released
o Not valid on 2011.10.25
o Not saved as an itemization
o Not valid at the time WIP or variances were calculated
o Not saved in the controlling area currency
This can be the case when the controlling area currency is not the
same as the company code currency. Since variances are always
calculated in the controlling area currency, the cost estimate must
be saved in controlling area currency (refer to "Procedure").
standard cost estimate for the material. Using this information, the
system can calculate the following data:
o Work in process (WIP) for the confirmed WIP quantities
o Scrap for the confirmed scrap quantities
o Variances between the target costs and the control costs
However, the cost estimate for material MXMC-001 in plant 6000 is:
o Missing
o Not released
o Not valid on 2011.10.25
o Not saved as an itemization
o Not valid at the time WIP or variances were calculated
o Not saved in the controlling area currency
This can be the case when the controlling area currency is not the
same as the company code currency. Since variances are always
calculated in the controlling area currency, the cost estimate must
be saved in controlling area currency (refer to "Procedure").