SAP transportation

1.CONFIGURATION TRANSPORT

flow:DEV(100) --scc1--> DEV(400) --STMS after release-> QAS(510) --STMS after release-->PRD(800)

1.SPRO 

  Open SAP refenence IMG  and find the path for related items.

  For example,

  to change MRP controller&Buyer code,the path is "Production--->Material requirements planning--->Mast Data--->Define MRP Controllers";

  to add new buyers "Materials Management--->Purchasing--->Create Purchasing Groups";

  (CS new user,need Tcode SM30 to maintain ZUSER_CUST_V)

  Save it with new TR and description,like"PP:Change username for PMC001";

2.SE09&SCC1

 SE09 to release the configuration,

 SCC1 to pull it to testing client 400

3.STMS:

 STMS to transport it to QAS 510 and PRD 800

 

2.PROGRAM TRANSPORT

flow:DEV(200) --active--> DEV(400) --STMS after release--> QAS(500) --STMS after release-->PRD(800)

1.Active it directly to test it in 400 

  Save it with new TR and description,like"SD:Change tax code for xxx";

2.SE09

  SE09 to release the program,

3.STMS

  STMS to transport it to QAS 500 and PRD 800

 

 

 

 

 

  

转载于:https://www.cnblogs.com/aurora-cj/p/9046398.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值