【SCI秘籍经验】我的科研感悟III(共4部分)

■ 改成Brief后再投
IEEE Transactions on Control Systems Technology - Paper ID TCST-2007-XXXX[/url]
发件人:"ieeetcst"
加入通讯录
时 间:2007年5月8日(星期二) 上午09:38
收件人:"XXX"

07-May-2007
Dear Mr. XXX:
Your paper entitled "XXXXXX" has been successfully submitted online and is presently being given full consideration for publication in the IEEE Transactions on Control Systems Technology.
Your Paper ID is TCST-2007-XXXX.
Please mention the above Paper ID in all future correspondence or when calling the office for questions. If there are any changes in your street address or e-mail address, please log in to Manuscript Central at http://mc.manuscriptcentral.com/tcst  and edit your user information as appropriate.
You can also view the status of your submission at any time by checking your Author Center after logging in to http://mc.manuscriptcentral.com/tcst .
Thank you for submitting your paper to the IEEE Transactions on Control Systems Technology.
Best Regards,
IEEE Transactions on Control Systems Technology Editorial Office

■超页被打回
IEEE Transactions on Control Systems Technology - TCST-2007-XXXX has been unsubmitted
发件人:"ieeetcst" 加入通讯录
时 间:2007年5月8日(星期二) 下午20:24
收件人:"XXX"

08-May-2007
Dear  Mr. XXX:
Your Paper, TCST-2007-XXXX, entitled "XXXXXX" has been unsubmitted to the IEEE Transactions on Control Systems Technology.  It has been unsubmitted  because it exceeds the length requirements for a brief paper. The maximum length allowed for a brief paper is 8 single-spaced pages in a double column format or  16 double-spaced pages in a single column format.
Please adjust the length of your paper and re-submit the manuscript for consideration of publication.  You may contact the Editorial Office if you have further questions.
Sincerely,
IEEE Transactions on Control Systems Technology Editorial Office

■缩短篇幅后再投
IEEE Transactions on Control Systems Technology - Paper ID TCST-2007-XXXX
发件人:"ieeetcst" 加入通讯录
时 间:2007年5月15日(星期二) 下午16:06
收件人:"XXX"

15-May-2007
Dear Mr. XXX:
Your paper entitled "XXXXXX" has been successfully submitted online and is presently being given full consideration for publication in the IEEE Transactions on Control Systems Technology.
Your Paper ID is TCST-2007-XXXX.
Please mention the above Paper ID in all future correspondence or when calling the office for questions. If there are any changes in your street address or e-mail address, please log in to Manuscript Central at http://mc.manuscriptcentral.com/tcst  and edit your user information as appropriate.
You can also view the status of your submission at any time by checking your Author Center after logging in to http://mc.manuscriptcentral.com/tcst .
Thank you for submitting your paper to the IEEE Transactions on Control Systems Technology.
Best Regards,
IEEE Transactions on Control Systems Technology Editorial Office

■再催稿
IEEE Transactions on Control Systems Technology
发件人:"ieeetcst" 加入通讯录
时 间:2007年8月23日(星期四) 上午00:32
收件人:"XXX"

22-Aug-2007
TCST-2007-XXXX -XXXXXX
Dear Mr. XXX:
Thank you for your email. I have forwarded the request to your Associate Editor XXX and asked him to contact you directly. If you haven't heard from in a week or so, please feel free to contact him directly at XXX@usouthal.edu. However, your paper's decision due date is still more than a month away. We typically allow four months for the review process.
Sincerely,
Ms. XXX
IEEE Transactions on Control Systems Technology
Re: Status of Revised Manuscript TCST-2007-XXXX
发件人:"ieeetcst" 加入通讯录
时 间:2007年10月4日(星期四) 上午00:49
收件人:"XXX"

Dear XXX,
Thank you for your email. The editor handling your paper is awaiting the rest of the reviews for your paper and has taken steps to remind the reviewers to turn in their reports. I expect he will contact you in the next few weeks, as soon as he has made a decision.
All best,
XXX
XXX wrote:
Dear Editors,

Thank you for your handling our manuscript.
I am very sorry for the previous emails because of not knowing the routine time of review for your journal.

Our revised paper  
'TCST-2007-XXXX         XXXXXX'
has been reviewed for over four months.
Would you like to give us some information about it?

Thank you very much.

Best Regards,
XXX
2007-09-28
IEEE Transactions on Control Systems Technology
发件人:"ieeetcst" 加入通讯录
时 间:2007年12月5日(星期三) 上午01:22
收件人:"XXX"

04-Dec-2007
TCST-2007-XXXX -XXXXXX
Dear Mr. XXX:
Your paper is currently out for  review. The associate editor handling you paper is awaiting one last review, which is due any day, before he make a decision on your paper. I hope that we will have an answer for you in the next few weeks.
Sincerely,
Ms. XXX
IEEE Transactions on Control Systems Technology

■第二次Decision-Accept
IEEE Transactions on Control Systems Technology - Decision on Manuscript ID TCST-2007-XXXX
发件人:"XXX"  
时 间:2007年12月22日(星期六) 上午08:01
收件人:"XXX"
抄    送:"ieeetcst"

21-Dec-2007
Dear Mr. XXX:
The paper "XXXXXX" which you have submitted for publication in the IEEE Transactions on Control Systems Technology has been reviewed.  A copy of the Associate Editor Report and copies of the reviews are included at the bottom of this letter.
I am pleased to report that your manuscript is acceptable for publication as a brief paper.  Please consider the comments contained in the reviews, and send a copy of the revised manuscript to the Editor-in-Chief as soon as convenient.  Please note that authors have a maximum of six months to revise their manuscript.  If this time is exceeded, the paper must go through the entire review process as in the case of a new submission.
Attached are PDF files for the Publication Checklist and Copyright Form.  You can submit the copyright electronically by clicking the "Create ECF" button next to the accepted manuscript listed in your Author Center, but you will still need to send the acknowledgment with the rest of the checklist materials.
Sincerely,
Prof. XXX
Associate Editor, IEEE Transactions on Control Systems Technology
XXX@usouthal.edu
Editor-in-Chief's address:
Professor Francis J. Doyle III
Editor-in-Chief
IEEE Transactions on Control Systems Technology
University of California, Santa Barbara
Chemical Engineering Department
Santa Barbara, CA  93106-5080
ieeetcst@engineering.ucsb.edu
Reviewer(s)' Comments to Author:
Reviewer: 1
Comments to the Author
I believe that the authors have made a serious and thorough effort to address all the issues ans points of criticism raised by the reviewers. However, they still need to:
i) take a final look and improve the English in various parts of the text
ii) show that all assumptions and conditions of the paper's theoretical section are met in the case study under consideration.
Reviewer: 2
Comments to the Author
(There are no comments)
Manuscript ID TCST-2007-XXXX is now in your Admin Center; ready for production checklist
发件人:"ieeetcst" 加入通讯录
时 间:2007年12月22日(星期六) 上午08:01
收件人:"XXX"

21-Dec-2007
Dear Mr. XXX:
Manuscript ID TCST-2007-XXXX entitled "XXXXXX" with Mr. XXX as submitting author, has been accepted to the IEEE Transactions on Control Systems Technology.
Please send the production checklist for this manuscript as soon as possible.
Sincerely,
XXX
IEEE Transactions on Control Systems Technology Editorial Office
ieeetcst@engineering.ucsb.edu

■转移版权
IEEE Copyright Transfer Confirmation for Article:XXXXXX
发件人:"ECopyright"  
时 间:2008年5月14日(星期三) 下午16:28
收件人:"XXX"

IEEE Copyright Transfer Confirmation Receipt:
=============================================
Publication Title: IEEE Transactions on Control Systems Technology
Article Title: XXXXXX
Author(s):XXX
Author E-mail: XXX@sina.com
Congratulations!
You have successfully completed the IEEE Electronic Copyright Form, a copy of
the fully executed Form is attached here for your records.
Please be sure to save this e-mail for any future reference.
If you have any questions about this process, please be sure to contact the
IEEE Intellectual Property Rights Office at:
445 Hoes Lane
Piscataway.NJ 08854-XXXX
Phone: +1 732 562 XXXX
Fax: +1 732 562 XXXX
E-mail: mailto:copyrights@ieee.org
Once again, congratulations, and thank you for being an IEEE author.
Sincerely,
XXX
IEEE Intellectual Property Rights
E-mail: mailto:XXX@ieee.org

■发送文章出版相关文件
Receipt of Checklist Items
发件人:"ieeetcst" [url=http://mail3-128.sinamail.sina.com.cn/uc/gettpl.php?t=readmail&ts=1258438534187_4]加入通讯录
时 间:2008年6月6日(星期五) 上午03:25
收件人:"XXX"

05-Jun-2008
TCST-2007-XXXX - XXXXXX
Dear Mr. XXX:
Thank you for sending us your checklist items. I have everything I
need to send your paper to the publisher when papers are next due. When your galley
proofs are ready, you will receive an e-mail notification and instructions from the
publisher. Please note that we have had three back to back special issues this year and that has created a backlog of papers. However, we are in the midst of implementing
a rapid post procedure so that papers will be available online sooner than they appear in print.
Congratulations on the acceptance of your paper.
Sincerely,
Ms. XXX
IEEE Transactions on Control Systems Technology

>>下接我的科研感悟IV

我的科研感悟I   http://emuch.net/bbs/viewthread.php?tid=1673978
我的科研感悟I I  http://emuch.net/bbs/viewthread.php?tid=1674000
我的科研感悟III  http://emuch.net/bbs/viewthread.php?tid=1674009
我的科研感悟IV  http://emuch.net/bbs/viewthread.php?tid=1674016

以下是对提供的参考资料的总结,按照要求结构化多个要点分条输出: 4G/5G无线网络优化与网规案例分析: NSA站点下终端掉4G问题:部分用户反馈NSA终端频繁掉4G,主要因终端主动发起SCGfail导致。分析显示,在信号较好的环境下,终端可能因节能、过热保护等原因主动释放连接。解决方案建议终端侧进行分析处理,尝试关闭节电开关等。 RSSI算法识别天馈遮挡:通过计算RSSI平均值及差值识别天馈遮挡,差值大于3dB则认定有遮挡。不同设备分组规则不同,如64T和32T。此方法可有效帮助现场人员识别因环境变化引起的网络问题。 5G 160M组网小区CA不生效:某5G站点开启100M+60M CA功能后,测试发现UE无法正常使用CA功能。问题原因在于CA频点集标识配置错误,修正后测试正常。 5G网络优化与策略: CCE映射方式优化:针对诺基亚站点覆盖农村区域,通过优化CCE资源映射方式(交织、非交织),提升RRC连接建立成功率和无线接通率。非交织方式相比交织方式有显著提升。 5G AAU两扇区组网:与三扇区组网相比,AAU两扇区组网在RSRP、SINR、下载速率和上传速率上表现不同,需根据具体场景选择适合的组网方式。 5G语音解决方案:包括沿用4G语音解决方案、EPS Fallback方案和VoNR方案。不同方案适用于不同的5G组网策略,如NSA和SA,并影响语音连续性和网络覆盖。 4G网络优化与资源利用: 4G室分设备利旧:面对4G网络投资压减与资源需求矛盾,提出利旧多维度调优策略,包括资源整合、统筹调配既有资源,以满足新增需求和提质增效。 宏站RRU设备1托N射灯:针对5G深度覆盖需求,研究使用宏站AAU结合1托N射灯方案,快速便捷地开通5G站点,提升深度覆盖能力。 基站与流程管理: 爱立信LTE基站邻区添加流程:未提供具体内容,但通常涉及邻区规划、参数配置、测试验证等步骤,以确保基站间顺畅切换和覆盖连续性。 网络规划与策略: 新高铁跨海大桥覆盖方案试点:虽未提供详细内容,但可推测涉及高铁跨海大桥区域的4G/5G网络覆盖规划,需考虑信号穿透、移动性管理、网络容量等因素。 总结: 提供的参考资料涵盖了4G/5G无线网络优化、网规案例分析、网络优化策略、资源利用、基站管理等多个方面。 通过具体案例分析,展示了无线网络优化中的常见问题及解决方案,如NSA终端掉4G、RSSI识别天馈遮挡、CA不生效等。 强调了5G网络优化与策略的重要性,包括CCE映射方式优化、5G语音解决方案、AAU扇区组网选择等。 提出了4G网络优化与资源利用的策略,如室分设备利旧、宏站RRU设备1托N射灯等。 基站与流程管理方面,提到了爱立信LTE基站邻区添加流程,但未给出具体细节。 新高铁跨海大桥覆盖方案试点展示了特殊场景下的网络规划需求。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值