Its increment does not match its pre-allocation size

If you have a chance to configure BPM Soa Email Notification, you may face this issue. 

 

Cause:

Exception occured during invocation of JCA binding: "JCA Binding execute of Reference operation 'insert' failed due to: DBWriteInteractionSpec Execute Failed Exception.
insert failed. Descriptor name: [****].
Caused by Exception [EclipseLink-7027] (Eclipse Persistence Services - 2.1.2.v20101206-r8635): org.eclipse.persistence.exceptions.ValidationException
Exception Description: The sequence named [TEST_SEQUENCE] is setup incorrectly. Its increment does not match its pre-allocation size..
Please see the logs for the full DBAdapter logging output prior to this exception. This exception is considered not retriable, likely due to a modelling mistake.
<!--[if !supportLineBreakNewLine]-->
<!--[endif]-->

 

 

Solution:

 

you must change the DBAdapter properties in WebLogic deployments console, make the preallocationSize same as the one used for the sequence (Increment By field):

 

Example:

 

Create Sequence Test_Sequence Start With 1 Increment By 1 Nominvalue Nomaxvalue Nocycle Nocache

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值